TITLE: 11/22 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Trying to lock DRMI, and we've been having some issues locking for the past four hours, but I think it might be a combo of the high secondary microseism and a medium sized earthquake that passed through? Hard to tell for sure.
LOG:
15:30UTC Initial alignment running
15:40 Relocking
16:36 NOMINAL_LOW_NOISE
20:51 Lockloss
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 16:33 | PEM | Robert | LVEA | n | Checking on equipment | 16:40 |
| 18:18 | PEM | Robert, Geneveive | LVEA | n | Moving cable | 21:18 |
| 18:47 | KarMeng | OpticsLab | y(local) | OPO work | 19:09 | |
| 20:21 | Corey | OpticsLab | n | Cleaning optics | 23:06 | |
| 20:48 | Sheila, KarMeng | OpticsLab | y(local) | OPO work | 21:30 | |
| 21:58 | CDS | Erik | Remote | N | RCG upgrade | 22:08 |
| 22:36 | PEM | Robert Sam Genevive | EY & MY | N | Setting up PEM injection? | 23:26 |
| 23:25 | PCAL | Tony | PCAL Lab | y(local) | Caps on spheres | 23:53 |
| 00:17 | JAC | Jennie | JOAT Lab | n | Just bringing in parts for the table | 00:24 |