Reports until 16:45, Friday 21 November 2025
H1 General
oli.patane@LIGO.ORG - posted 16:45, Friday 21 November 2025 (88200)
Ops Day Shift End

TITLE: 11/22 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Trying to lock DRMI, and we've been having some issues locking for the past four hours, but I think it might be a combo of the high secondary microseism and a medium sized earthquake that passed through? Hard to tell for sure.
LOG:

15:30UTC Initial alignment running
15:40 Relocking
16:36 NOMINAL_LOW_NOISE
20:51 Lockloss

Start Time System Name Location Lazer_Haz Task Time End
16:33 PEM Robert LVEA n Checking on equipment 16:40
18:18 PEM Robert, Geneveive LVEA n Moving cable 21:18
18:47   KarMeng OpticsLab y(local) OPO work 19:09
20:21   Corey OpticsLab n Cleaning optics 23:06
20:48   Sheila, KarMeng OpticsLab y(local) OPO work 21:30
21:58 CDS Erik Remote N RCG upgrade 22:08
22:36 PEM Robert Sam Genevive EY & MY N Setting up PEM injection? 23:26
23:25 PCAL Tony PCAL Lab y(local) Caps on spheres 23:53
00:17 JAC Jennie JOAT Lab n Just bringing in parts for the table 00:24
Images attached to this report