Displaying report 1-1 of 1.
Reports until 16:57, Friday 21 November 2025
H1 General
anthony.sanchez@LIGO.ORG - posted 16:57, Friday 21 November 2025 (88201)
Friday Ops Eve Shift

TITLE: 11/22 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Oli
CURRENT ENVIRONMENT:
    SEI_ENV state: USEISM
    Wind: 6mph Gusts, 3mph 3min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.52 μm/s 
QUICK SUMMARY:
The IFO is currently unlocked and attempting to lock DRMI. Secondary microseism seems elevated but it's low enough to lock.
Flashes look good. 
Pushed to PRMI early. DRMI locked!... Nice.
 

 

Displaying report 1-1 of 1.