Reports until 16:57, Friday 21 November 2025
H1 General
anthony.sanchez@LIGO.ORG - posted 16:57, Friday 21 November 2025 (88201)
Friday Ops Eve Shift

TITLE: 11/22 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Oli
CURRENT ENVIRONMENT:
    SEI_ENV state: USEISM
    Wind: 6mph Gusts, 3mph 3min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.52 μm/s 
QUICK SUMMARY:
The IFO is currently unlocked and attempting to lock DRMI. Secondary microseism seems elevated but it's low enough to lock.
Flashes look good. 
Pushed to PRMI early. DRMI locked!... Nice.