Displaying report 1-1 of 1.
Reports until 22:28, Friday 21 November 2025
H1 General
anthony.sanchez@LIGO.ORG - posted 22:28, Friday 21 November 2025 (88204)
Fridays's Ops Eve Shift End

TITLE: 11/22 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Got H1 relocked at 04:09 UTC.  
Sheila is running a script that will take many hours and will wait for the IFO to be relocked.

LOG:

 

Start Time System Name Location Lazer_Haz Task Time End
18:18 PEM Robert, Geneveive LVEA n Moving cable 21:18
22:36 PEM Robert Sam Genevive EY & MY N Setting up PEM injection? 23:26
Displaying report 1-1 of 1.