TITLE: 11/22 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Got H1 relocked at 04:09 UTC.
Sheila is running a script that will take many hours and will wait for the IFO to be relocked.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 18:18 | PEM | Robert, Geneveive | LVEA | n | Moving cable | 21:18 |
| 22:36 | PEM | Robert Sam Genevive | EY & MY | N | Setting up PEM injection? | 23:26 |