Reports until 07:53, Saturday 22 November 2025
H1 General
ryan.crouch@LIGO.ORG - posted 07:53, Saturday 22 November 2025 (88206)
OPS Saturday morning check-in

STATE of H1: Planned Engineering
CURRENT ENVIRONMENT:
    SEI_ENV state: USEISM
    Wind: 5mph Gusts, 2mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.40 μm/s 
QUICK SUMMARY:

We've been locked for 11:45, Sheila has a SQZ script running which I can see by the SQZ_MANAGER complaining about the ANG_ADJ_SERVO not being on. Secondary microseism is still elevated.