Displaying report 1-1 of 1.
Reports until 16:32, Monday 24 November 2025
H1 General
oli.patane@LIGO.ORG - posted 16:32, Monday 24 November 2025 (88226)
Ops Day Shift End

TITLE: 11/25 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Locked for 9.5 hours. Only thing to report is that lots of measurements were taken today and are still being taken.
LOG:

15:30UTC Locked for 30 minutes
 19:30 Broadband calibration measurements taken

Start Time System Name Location Lazer_Haz Task Time End
15:42 FAC Randy YARM n Caulking joints 17:49
16:14 FAC Nellie MY n Tech clean 17:05
16:15 FAC Kim MX n Tech clean 16:57
16:16 PEM Robert, Genevieve LVEA n Measurements 20:46
18:11 ISC Corey OpticsLab n Cleaning optics 20:09
18:19 JAC Jennie JOAT n Installing components 19:53
20:46 PEM Genevieve, Robert EY n Moving speaker 22:20
21:46 ISC Corey OpticsLab n Cleaning optics 22:22
21:57 JAC Jennie JOAT n Installing components pt2 22:30
23:58 PEM Robert, Genevieve EY n Shaking up EY 01:58
00:11 JAC Jennie JOAT n Putting components in 01:11
Displaying report 1-1 of 1.