TITLE: 11/25 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Locked for 9.5 hours. Only thing to report is that lots of measurements were taken today and are still being taken.
LOG:
15:30UTC Locked for 30 minutes
19:30 Broadband calibration measurements taken
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:42 | FAC | Randy | YARM | n | Caulking joints | 17:49 |
| 16:14 | FAC | Nellie | MY | n | Tech clean | 17:05 |
| 16:15 | FAC | Kim | MX | n | Tech clean | 16:57 |
| 16:16 | PEM | Robert, Genevieve | LVEA | n | Measurements | 20:46 |
| 18:11 | ISC | Corey | OpticsLab | n | Cleaning optics | 20:09 |
| 18:19 | JAC | Jennie | JOAT | n | Installing components | 19:53 |
| 20:46 | PEM | Genevieve, Robert | EY | n | Moving speaker | 22:20 |
| 21:46 | ISC | Corey | OpticsLab | n | Cleaning optics | 22:22 |
| 21:57 | JAC | Jennie | JOAT | n | Installing components pt2 | 22:30 |
| 23:58 | PEM | Robert, Genevieve | EY | n | Shaking up EY | 01:58 |
| 00:11 | JAC | Jennie | JOAT | n | Putting components in | 01:11 |