OPS Wednesday DAY shift summary

TITLE: 11/26 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: We've had two locklosses today, both while people where out on the floor. Relocking has been fairly automated, we had a TCS CO2Y laser issue that we resolved. We are relocking at MOVE_SPOTS as of 20:30 UTC. LVEA zone4G got a bit warm but its leveled out.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
16:47 PEM Robert LVEA N Set up measurements, check on zone4 17:05
17:31 PEM Robert LVEA N Setup shaker in *danger zone*, in and out 20:18
17:34 ISC Kar Meng Optics lab LOCAL OPO work 19:27
18:56 TCS Sheila LVEA N Reset CO2Y 19:11
19:38 FAC Tyler Mids N Find boom lift and inflate the tires 20:06
19:54 TCS Daniel, Sheila LVEA N Wiggle TCS CO2Y cable 20:03