TITLE: 11/26 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: We've had two locklosses today, both while people where out on the floor. Relocking has been fairly automated, we had a TCS CO2Y laser issue that we resolved. We are relocking at MOVE_SPOTS as of 20:30 UTC. LVEA zone4G got a bit warm but its leveled out.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 16:47 | PEM | Robert | LVEA | N | Set up measurements, check on zone4 | 17:05 |
| 17:31 | PEM | Robert | LVEA | N | Setup shaker in *danger zone*, in and out | 20:18 |
| 17:34 | ISC | Kar Meng | Optics lab | LOCAL | OPO work | 19:27 |
| 18:56 | TCS | Sheila | LVEA | N | Reset CO2Y | 19:11 |
| 19:38 | FAC | Tyler | Mids | N | Find boom lift and inflate the tires | 20:06 |
| 19:54 | TCS | Daniel, Sheila | LVEA | N | Wiggle TCS CO2Y cable | 20:03 |