Displaying report 1-1 of 1.
Reports until 07:42, Monday 01 December 2025
LHO General
ryan.short@LIGO.ORG - posted 07:42, Monday 01 December 2025 (88272)
Ops Day Shift Start

TITLE: 12/01 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 2mph Gusts, 0mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.23 μm/s 
QUICK SUMMARY: Outdoor temps below freezing and foggy on-site. H1 has been down over the weekend and upgrades begin today with CDS work.

Displaying report 1-1 of 1.