Seems like all of the models are running, but many of the guardians are still down. What I was able to get up and running:
HEPI Pump stations for all 3 buildings. Patrick had to help some with the end station beckhoff. I had to adjust the float switch for the overflow tank at EX, we were ridding just at the trip level there. The corner station Athena looked dead when I powered on the power supply on the mezzanine, but I think some of the leds are just dead. Good thing we plan to replace that soon.
Both BRS are running. Patrick had to power cycle the EX beckhoff, we were then able to restart the software. The damping settings got reverted (highthreshold and lowthreshold), so I had to fix those through the cli. Heater settings also got lost, both brs cooled off a bit over the several hours we were blind, and will take a little while to warm back up. Probably will keep watching for a while to make sure everything is okay, but I think we are good.
Some of the chambers are able to be isolated through guardian, but many have dead guardian nodes. I manually engaged damping where I couldn't get the ISI isolated via guardian.
None of the blend, sensor correction or cps diff is alive enough to recover yet. I have manually disabled sensor correction for the corner, the ends can't be isolated yet. I guess that will wait for tomorrow.