Reports until 07:54, Wednesday 10 December 2025
H1 General
anthony.sanchez@LIGO.ORG - posted 07:54, Wednesday 10 December 2025 (88455)
Wednesday Ops Shift Signing On

TITLE: 12/10 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: SEISMON_ALERT
    Wind: 46mph Gusts, 34mph 3min avg
    Primary useism: 0.14 μm/s
    Secondary useism: 0.39 μm/s 
QUICK SUMMARY:
Looks like someone woke up and ran an Initial_Alignment first think this morning.
When I got it H1 was in an Initial Alignment complete state. which is fantastic, but unfortunately the Wind is Howling on site right now. 
I'm going to try to lock 3 times just to see if I can catch a lucky lock. But the Wind forcast look abysmal for locking today. 

Images attached to this report