TITLE: 12/15 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 25mph Gusts, 19mph 3min avg
Primary useism: 0.05 μm/s
Secondary useism: 0.44 μm/s
QUICK SUMMARY: Gate valves 5 & 7 closed, plan is to vent the CS and start the SUS CDS upgrade. Vent meeting at 830 in the control room today to coordinate.
Noting the current state of the select systems: