TITLE: 12/17 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 40mph Gusts, 26mph 3min avg
Primary useism: 0.15 μm/s
Secondary useism: 0.59 μm/s
QUICK SUMMARY:
IFO is in IDLE for PLANNED ENGINEERING
A look at today's activities: