LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:38, Wednesday 17 December 2025 (88579)
OPS Day Shift Summary

TITLE: 12/18 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

IFO is in IDLE for PLANNED ENGINEERING

Lot's of good progress today:

Other:

Will edit to add alogs that are submitted after shift.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:57 SAF LASER LVEA YES LVEA is LASER HAZARD \u0d26\u0d4d\u0d26\u0d3f (\u2022O\u2022) 10:51
15:40 FAC Randy LVEA Y Craning in west bay 15:46
16:18 FAC Kim, Nellie LVEA Y Technical Cleaning 17:26
16:48 OPS Tony LVEA Y Turning on light pipe 16:53
16:56 TCS Louis, Matt Vac-Prep Lab N Cheeta Work 20:08
17:22 SQZ Sheila LVEA Y Scattered light investigation 20:04
17:26 SUS Rahul LVEA Y HAM1 JAC Work 20:04
17:30 SQZ Eric, Daniel, Robert LVEA Y HAM7 Scatter Light Investigation 20:04
17:33 VAC Jordan LVEA Y Purge air dew pt measurement 17:44
18:00 OPS RyanC LVEA Y Bring Dust monitor to HAM1 18:15
18:13 TCS Masayuki, Jennie Vac-Prep Lab N JAC Work - Jennie out 10:50 19:39
18:31 IAS Jason LVEA Y FARO Set-up by Biergarten out at 19:30 20:07
18:39 SUS Betsy LVEA/Labs Y Support for HAM1 20:04
19:13 TCS Jennie Prep lab N JAC work 19:39
19:42 SEI Jim LVEA Y Replace CPS card 20:51
20:04 PEM Robert LVEA Y HAM7 Scatter 21:50
20:07 FAC Randy MY N Moving boom lift to OSB 01:06
21:13 EE Fil CER N JM Coil Driver Check 22:00
21:24 IAS Ryan C, Jason LVEA Y BSC2 FARO 00:23
21:25 SUS Betsy, Rahul LVEA Y JAC Contd. 23:48
22:02 SQZ Sheila, Kar Meng, Daniel, Eric LVEA Y HAM7 Work Contd. 01:02
22:56 PCAL Tony PCAL Lab N Checking on meas. 23:02
23:09 OPS Oli LVEA Y HAM12 Rack Check 23:58
23:14 JOG Matt, Masayuki, Gabriele Yarm N Maintaining and improving health 23:52
00:01 TCS Matt Vac-Prep Lab N Cheeta Lab 01:01