TITLE: 12/19 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: HAM7 work continued, JM TFs were taken, HAMs 3 & 4 and were locked, and a network switch went down around noon and took all the front ends with it. The PSL cameras were taken down for a measurement today and someone who knows how needs to bring them back up sometime.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:57 | SAF | LASER | LVEA | YES | LVEA is LASER HAZARD (\u2310\u25a0_\u25a0) | 10:51 |
| 15:35 | EPO | Corey | Yarm | N | Take pictures | 16:31 |
| 15:25 | FAC | Randy | LVEA | Y | Craning | 15:43 |
| 15:25 | ISC | Sheila | LVEA | Y | Check on laptop | 15:30 |
| 15:49 | FAC | Nellie, Kim | LVEA | Y | Tech clean | 17:10 |
| 16:29 | EE | Fil | LVEA | Y | Start disconnecting IOT2L | 17:42 |
| 16:49 | ISC | TJ | LVEA | Y | Start moving IOT2L | 17:42 |
| 16:59 | FAC | Randy | LVEA | Y | Help TJ move table | 17:37 |
| 17:05 | PSL | Alicia, Jean-Rene | LVEA | Y | Turn off cameras near PSL enc | 18:02 |
| 17:47 | FAC | Richard | LVEA | Y | Walkthrough | 18:08 |
| 17:55 | FAC | Nellie, Kim | LVEA | Y | Tech clean | 18:29 |
| 18:22 | VAC | Travis | LVEA | Y | Turn down purge air for HAM1 for JM measurement | 18:25 |
| 18:33 | ISC | Masayuki | LVEA | Y | Drop off parts at HAM1 | 19:53 |
| 18:36 | SEI | Jim, Randy | LVEA | Y | Lock HAM3 HEPI, then remove PEM ST endcaps | 20:01 |
| 18:39 | SQZ | Sheila, Kar Meng, Daniel | LVEA | Y | HAM7 checks, OPO, Kar Meng out at 23:36 | 00:00 |
| 18:58 | OPS | Tony | LVEA | Y | Talk to jim about HAM1 shaking | 19:09 |
| 20:02 | CAL | Tony | PCAL lab | Y | PRep meas | 20:12 |
| 20:36 | VAC | Travis | LVEA | Y | Turn purge air back up | 20:39 |
| 21:26 | ISC | Masayuki | Optics lab | LOCAL | JAC ASSY work | 22:08 |
| 21:55 | ISC | Jennie | LVEA, Optics lab | Y | Look for, and gather JAC parts | 22:13 |
| 21:35 | FAC | Richard, plus crew | OSB roof | N | Look at the view | 21:56 |
| 22:15 | FIT | Matt, Anna, TJ, Masayuki, Gabriele, ... | Xarm, Yarm | N | Running | 23:51 |
| 22:57 | ISC | Jennie | LVEA HAM1 | Y | Put away JAC parts, cleanup for break | 00:20 |
| 23:25 | PEM | Robert | LVEA | Y | HAM7 | 23:43 |
| 23:40 | OPS | Tony | LVEA | Y | Help Jennie at HAM1 | 00:20 |
| 00:05 | ISC | Masayuki | LVEA | Y | Help Jennie | 00:20 |