12/26 Site Walkthrough
Utilizing the buddy system, (R. McCarthy) I walked the site today and found no immediate issues. The first half of x2 is a barely passable but am working with VAC to determine the next delivery location. To that end, all CP access points are largely unobstructed. The wind fence shows no additional damage at EY, and EX is still intact. FAC systems are operating normally. Large heat load spaces felt cool, no doors were found ajar and the water system is behaving normally (presently full @ ~66.5"). VEA's were all business as usual. 

During the visit I noted a magmeter flow value of 1010675 which should serve as a useful metric in determining any leak/bleeding of the potable system. While at the water room, domestic supply pressure appeared to be holding well. A follow up on the morning of 1/5 will be performed to understand usage over the break while little to no demand is applied.

T. Guidry