Reports until 13:51, Friday 02 January 2026
LHO General (VE)
tyler.guidry@LIGO.ORG - posted 13:51, Friday 02 January 2026 (88674)
After hours site work 1/2/26
Upcoming LN2 deliveries at x mid and x end required some tumbleweed attention this afternoon. X1 is still largely clear and x mid should be easily accessible. The earlier half of X2 is the worst area. I was able to cut a single lane to X2 before the harvester jammed up beyond what I could free by myself. What remains in the harvester chute needs a few days to dry out. As do I.

As a follow up to my previous log I checked the magmeter in the water room which meters domestic supply to the site and found a reading of 1011247.

T. Guidry