TITLE: 01/07 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 22mph Gusts, 11mph 3min avg
Primary useism: 0.06 μm/s
Secondary useism: 0.60 μm/s
QUICK SUMMARY: HAM7 beam alignment and HAM1 JAC install work continues today. Quite windy overnight.