TITLE: 01/08 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 6mph Gusts, 3mph 3min avg
Primary useism: 0.05 μm/s
Secondary useism: 0.87 μm/s
QUICK SUMMARY:
Trello summary for today:
HAM! -mode matching check - Laser Hazard
HAM1 - JAC install & Anignment
HAM7 - More SQZ work- Laser Hazard
LVEA is currently in Laser Hazard status.