H1 General
oli.patane@LIGO.ORG - posted 16:29, Tuesday 20 January 2026 (88821)
Ops Day Shift End

TITLE: 01/21 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Continued alignment for HAM7, and BNK measurements on HAM1 periscopes. Currently the LVEA is LASER HAZARD
LOG:                                                                                                                                                                                                                                                                                                                        

Start Time System Name Location Lazer_Haz Task Time End
15:37 FAC Randy LVEA n Craning rails (started at 15:15) 16:09
15:37 FAC Nellie LVEA n Tech clean 16:21
16:11 FAC Randy, Corey LVEA YES Craning 17:23
16:31 VAC Travis MX, EX n Turbo pump tests 21:10
16:35 SQZ Sheila LVEA YES HAM7 alignment 19:43
16:51 FAC Nellie LVEA YES Tech clean 17:30
16:57 TCS Matt JOAT Lab n Building up second table 19:21
17:17 SEI Jim, Keita LVEA YES BNK 19:52
17:23 PEM Robert LVEA YES Mounting accelerometers 18:53
17:37 SQZ KarMeng LVEA YES HAM7 alignment 19:43
17:37 SAF LVEA IS LASER HAZARD LVEA YES LVEA IS LASER HAZARD 20:30
17:46 FAC Randy, Corey LVEA YES Craning 19:00
18:09   Matt LVEA YES Grabbing laptop 18:26
18:13 VAC Jordan MY, EY n Turbo pump tests 22:04
19:04 SEI Rahul LVEA YES Helping Jim 19:24
19:17 PCAL Tony PCAL Lab y(local) Getting ready for a measurement 19:24
19:22 FIT Matt YARM n Running 20:30
19:43 SAF Corey LVEA YES Transitioning to Laser SAFE 20:03
20:09 EPO Mike, Rana, tour LVEA n Tour 21:09
20:33 EE Fil LVEA YES Cabling 00:17
20:41 FAC Randy LVEA n Securing railing 21:09
21:10 SAF Tony LVEA YES Transitioning to laser HAZARD 21:28
21:12 SQZ Sheila, KarMeng LVEA YES HAM7 alignment 22:34
21:40 FAC Tyler LVEA, MX, MY YES 3IFO checks 23:40
21:52 VAC Travis Optics Lab n Grabbing tool 21:58
22:08 JAC Jason LVEA YES Parts hunting and FARO spot hunting 22:31
22:46 PCAL Tony PCAL Lab y(local) Finding case for beamsplitter 23:17
22:49 PEM Robert LVEA YES Mounting accelerometers ongoing
22:49 SAF LVEA IS LASER HAZARD LVEA YES LVEA IS LASER HAZARD ongoing
22:50 JAC Jason, Jennie Optics Lab n Hunting for parts 23:02
00:18 SEI Jim, Keita LVEA YES BNK measurements 00:20