TITLE: 01/23 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: HAM7 OPO Laser Hazard work, EOM in the Optics lab, and HAM1 JAC/ISCT1 table work all continued today. VAC start working on the relay tube, they're just waiting on a work permit to remove the viewport from HAM5.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 22:49 | SAF | LVEA IS LASER HAZARD | LVEA | YES | LVEA IS LASER HAZARD \u0d26\u0d4d\u0d26\u0d3f(\u239a_\u239a) | 16:49 |
| 16:01 | FAC | Nellie | LVEA | Y | Tech clean | 17:06 |
| 16:05 | FAC | Kim | LVEA | Y | Tech clean | 17:06 |
| 16:32 | SQZ | Sheila | LVEA | Y | HAM7 work cont, OPO | 19:55 |
| 16:53 | FAC | Randy | LVEA | Y | Plug in Scissor lift and forklift | 17:11 |
| 17:11 | PEM | Robert | LVEA | Y | Laser vibrometer work, MCT baffles in and out | 19:38 |
| 17:16 | JOTE | Matt, Sophie | PREP lab | N | JOAT work | 19:01 |
| 17:43 | FAC | Kim | EndX | N | Tech clean | 18:24 |
| 17:43 | SQZ | Kar Meng | LVEA | Y | HAM7 OPO work | 19:55 |
| 17:46 | ISC | Keita, Elenna | Optics lab | LOCAL | EOM work | 20:14 |
| 18:25 | FAC | Kim | Midx | N | Tech clean | 18:52 |
| 18:33 | OPS | Ryans | LVEA | Y | Check with HAM7 crew | 18:33 |
| 18:34 | ISC | Jenne, Jennie | LVEA | Y | HAM1 JAC and ISCT1 work | 20:41 |
| 18:57 | VAC | Jordan | LVEA | Y | Grab some parts | 19:05 |
| 19:14 | EE | Marc | LVEA | Y | PSL racks, power supply swap | 19:21 |
| 19:14 | EE | Daniel | LVEA | Y | HAM6 rack surverying | 20:41 |
| 19:34 | SUS | Jeff | CER | Y | Take rack pictures, upper mezz | 19:50 |
| 20:49 | EE | Marc | LVEA | Y | PZT power supply swap | 21:05 |
| 20:45 | SUS | Jeff | CER | Y | Rack pictures | 20:55 |
| 21:37 | SQZ | Sheila, Kar Meng | LVEA | Y | HAM7 OPO work | 22:55 |
| 21:58 | ISC | Jennie | LVEA | Y | Check on laser | 22:07 |
| 22:12 | JOTE | Matt | PREP lab | N | JOTE work | 22:42 |
| 22:19 | ISC | Jennie | LVEA | Y | Add a connector | 22:25 |
| 22:23 | ISC | Keita, Elenna | Optics lab | LOCAL | EOM work | 00:06 |
| 22:35 | PEM | Robert | LVEA | Y | Laser vibrometry | 23:01 |
| 23:11 | VAC | Jordan | LVEA | Y | Relay tube work, HAM7 area | 23:55 |
| 00:10 | PEM | Robert | LVEA | Y | Laser vibrometer measurments | 00:20 |