HAM7-Y Door is on

(Randy, Jordan, Travis, Gerardo)

After lunch we installed HAM7 -Y door.  Note regarding this door to keep it on our memory, there are nicks and a few scratches on the door's flange surface, between 10 to 2 O'clock, but the scratches and nicks are away from the O-ring sealing area.

BTW, all the bolts are on the door, and they were torqued.

We also installed the two 12" OD blanks on the +Y door access ports.  Both blanks will need to be tested for leaks once the chamber is pumped down.