TITLE: 02/06 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 0mph Gusts, 0mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.31 μm/s
QUICK SUMMARY:
HAM1 JAC work will continue. HAM7 is closed but pumpdown has not started yet. LVEA continues in the Bifurcated Laser Safe state.