TITLE: 02/06 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
Super Bowl Weekend SHIFT SUMMARY:
JAC team continued with JAC alignment work in HAM1. HAM3 AIP was swapped & started pumping over the weekend.
(Go Seahawks!)
LOG:
- 1611-1725 Optics lab & LVEA technical cleaning (kim)
- 1612-1622 eMod retrofits/checks (randy)
- 1636-1920 heading back out & will use crane for handrail moves (randy)
- 1836-1845 Opening lightpipe & increasing power via rotation stage for HAM1 team (ryanS)
- 1837-2014 HAM1 ghost beam search for JAC (keita, masayuki)
- 2241 HAM1 work continues (keita, masayuki)
- 2300 Jennie joins JAC team
- 1838-1851 power cycle volt meters (tony)
- 1906-2123 swapping out Annulus Ion Pump (AIP) at HAM3 (gerardo, jordan)
- 2249 start pumping down HAM3 AIP (gerardo, jordan)
- 1925 Taking laser power from 1.0 to 0.100 W (ryanS)
- 2040 Had issues with the Ops Camera/Access system computer, named ACCESSCONTROL (it's not ZOTPSL2). Problem was with OpenEye (camera app) not working (Refresh would do nothing). I restarted the app a few times, and also restarted the computer as well. Access System (Intelli-Site) app was fine. Thinking it was a network issue because it said there was no access to the internet, I clicked Network Reset. But after this also lost Intelli-Site. Tony and Dave did a few checks and also phoned Richard with no luck. As workaround, using the OpenEye webpage on the Operator CDS computer and if someone is at the gate, we can open it via the ops phone.
- 2051 nds1 restart (dave)---this required a restart to FOM ndscopes.
- 2118-2220 Checking eMod rail parts at EY & EX. (randy)
- 2230-2301 HAM1/IOT2 checks (jennie, sheila)
- 2334 Timing checks at both EX & EY CERs (Dave)
- 0008 Input power raised to 1W for JAC (ryanS)
- 0033 HAM3 AIP is pumping over the weekend Aux-Cart near HAM3 & gerardo/jordan are done for the day.