TITLE: 02/09 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 6mph Gusts, 4mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.34 μm/s
QUICK SUMMARY:
HAM7 not pumped down. HAM1 JAC work continues. LVEA is in the Bifurcated Laser SAFE state. And Seahawks are Super Bowl Champs!
Coordination Meeting Notes: