TITLE: 02/18 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: N/A
SHIFT SUMMARY: Busy day today! The HAM1 EOM was moved to it's final position this morning, JM3 was placed in position downstream of the JAC, and recovery of beam alignment into the IMC is ongoing. Cranes were worked on in the LVEA as well today.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 22:49 | SAF | LVEA is Laser SAFE | LVEA | NO* | LVEA is Laser SAFE *Bifurcated HAM1/2* | Ongoing |
| 16:47 | SEI | Jeff | Opt Lab | Local | SPI work | 21:25 |
| 16:49 | FAC | Kim, Nellie | LVEA | N | Technical cleaning | 18:03 |
| 16:58 | FAC | Randy | LVEA | N | Scaffold at test stand in W-bay | 17:27 |
| 17:00 | JAC | Keita | LVEA | YES | HAM1 EOM alignment | 18:19 |
| 17:08 | JAC | Betsy | LVEA | YES | HAM1 JAC alignment | 18:54 |
| 17:10 | JAC | Jason | LVEA | YES | HAM1 JAC alignment | 18:33 |
| 17:12 | FAC | Chris | MY | N | Getting parts for FAMIS | 18:12 |
| 17:17 | JAC | Camilla | LVEA | YES | JAC table alignment | 19:11 |
| 17:17 | IOO | Jennie | CR | N | IMC recovery | 18:52 |
| 17:48 | FAC | Crane tech | LVEA | N | Crane repairs | 23:30 |
| 18:04 | FAC | Kim | FCES | N | Technical cleaning | 18:54 |
| 18:14 | CDS | Fil, Marc | LVEA | N | Cable pulling HAM5/6 | 20:16 |
| 18:24 | FAC | Nellie | MY | N | Technical cleaning | 18:52 |
| 18:29 | VAC | Travis, Gerardo | LVEA | N | HAM6 AIP jack swap | 18:40 |
| 18:30 | JAC | Jenne +3 | LVEA | - | Tour and JAC work intro | 19:02 |
| 18:32 | TCS | Oli | MER | N | TCS chiller checks | 18:40 |
| 19:03 | JAC | Jason | LVEA | YES | HAM1 alignment | 20:11 |
| 19:27 | JAC | Jennie | LVEA | YES | HAM1 alignment | 20:11 |
| 19:32 | FAC | Kim | EX | N | Technical cleaning | 20:15 |
| 19:48 | FAC | Tyler | LVEA | N | Checking on crane tech | 19:53 |
| 19:53 | JAC | Camilla | Opt Lab, LVEA | - | Getting parts for JAC table | 20:26 |
| 21:04 | SAF | Travis | LVEA, EX, EY | - | Laser safety signage | 21:57 |
| 21:34 | --- | Camilla +4 | Roof | N | Sightseeing | 21:48 |
| 21:45 | EE | Marc, Fil | LVEA | YES | Finishing up cable pulling in trays above H456 | 22:30 |
| 22:13 | FAC | Mike, others | MY | N | CEBEX site survey | 22:54 |
| 22:30 | CDS | Marc, Fil | MY | N | Getting cables | 00:30 |
| 22:31 | TCS | Sophie | Prep Lab | Local | CHETA table work | 00:54 |
| 22:38 | JAC | Keita, Jason | LVEA | YES | HAM1 alignment checks (Keita out @ 23:07) | 00:12 |
| 22:39 | SUS | Rahul | LVEA | YES | JM3 installation | 00:11 |
| 22:50 | PEM | Robert | EX | N | Grounding work | Ongoing |
| 22:50 | JAC | Jennie | LVEA | YES | HAM1 alignment | 00:16 |
| 22:52 | AOS | Camilla, Shreyan | LVEA, Prep Lab | YES | JAC table alignment | 00:52 |
| 22:59 | VAC | Gerardo | LVEA | N | Looking for parts | 23:59 |
| 23:09 | JAC | Betsy | LVEA | YES | JM3 installation | 00:15 |
| 23:17 | FAC | Tyler | LVEA | N | Checking on crane tech | 23:30 |
| 23:21 | CDS | Tony | EX, EY | N | CDS inventory | 00:26 |