TITLE: 02/19 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: HAM1 work continued today
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:42 | FAC | Crane tech | LVEA | YES | Crane work | 17:58 |
| 15:45 | VAC | Gerardo | LVEA | YES | Turning down purge air | 16:00 |
| 15:45 | FAC | Kim, Nellie | LVEA | YES | Tech clean (Nellie out 16:24) | 16:28 |
| 16:55 | SUS | Fil | LVEA | YES | Swapping cables for PM1 troubleshooting | 17:02 |
| 16:59 | Camilla | LVEA | n | Looking for parts | 17:08 | |
| 17:00 | FAC | Kim | LVEA | n | Tech clean | 17:32 |
| 17:08 | FAC | Nellie | MY | n | Tech clean | 16:08 |
| 17:11 | FAC | Randy | LVEA | n | Measuring test stand | 17:54 |
| 17:33 | FAC | Kim | MX | n | Tech clean | 18:23 |
| 17:49 | SUS | Fil | LVEA | YES | Swapping more cables for PM1 troubleshooting | 17:57 |
| 18:12 | EE | Marc | MER | n | 20:02 | |
| 19:00 | SUS | Fil | LVEA | YES | Swapping back cables | 19:10 |
| 19:04 | JAC | Jennie, Jason | LVEA | YES | HAM1 alignment | 20:53 |
| 19:04 | VAC | Gerardo | LVEA | N | Turning up HAM1 purge air | 19:18 |
| 19:05 | TCS | Camilla, Sophie, Shreyan | Prep Lab | Local | CHETA table work | 20:18 |
| 19:09 | JAC | Keita | LVEA | YES | Joining JAC crew | 20:53 |
| 19:16 | SUS | Rahul | LVEA | YES | Helping with JM3 | 20:54 |
| 19:16 | JAC | Betsy | LVEA | YES | Wiring up JAC table | 20:25 |
| 19:18 | VAC | Jordan | LVEA | n | Checking on HAM7 vacs | 20:03 |
| 20:20 | PEM | Robert | EX | n | Grounding himself | 21:44 |
| 20:29 | RyanC | CER | n | Putting away dust monitor | 20:32 | |
| 20:35 | EE | Marc, Fil | MY | n | Picking up cables | 22:05 |
| 21:31 | TCS | Camilla, Sophie, Shreyan | Prep lab | LOCAL | CHETA table work | 22:56 |
| 21:34 | FAC | Richard | LVEA | N/Y | Safety checks | 21:46 |
| 21:41 | VAC | Travis, Jordan | LVEA | n | Setting up leak checker on HAM7 | 23:11 |
| 22:28 | Betsy | LVEA | YES | Checking out JAC table | 23:05 | |
| 22:36 | VAC | Gerardo | LVEA | YES | Turning down purge air | 22:16 |
| 22:50 | PEM | Robert | EX | n | Geting more grounded | 00:55 |
| 23:02 | Betsy | LVEA | YES | Turning purge air back up | 23:30 | |
| 23:29 | SUS | Rahul | LVEA | YES | Adjusting JM3 osem flags | 23:55 |
| 23:37 | JAC | Jason, Keita | LVEA | YES | JAC alignment | ongoing |
| 23:40 | JAC | Betsy | LVEA | yes | JAC table work | ongoing |
| 00:04 | VAC | Travis, Jordan | LVEA | n | HAM7 leak checking | 00:31 |
| 00:16 | TCS | Camilla, Sophie | OpticsLab | n | CHETA work | ongoing |
| 00:17 | TCS | Camilla, Sophie | LVEA | YES | Checking in with Betsy | 00:31 |