TITLE: 02/20 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
IFO is in IDLE for PLANNED MAINTENANCE
Calm day. HAM1 work continued.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 22:49 | SAF | LVEA is Laser SAFE | LVEA | NO* | LVEA is Laser SAFE *Bifurcated HAM1/2* | 16:49 |
| 15:42 | FAC | Randy | LVEA | N | Looking at test stand | 16:15 |
| 15:42 | FAC | Nellie | LVEA | Y | Technical Cleaning | 18:35 |
| 16:48 | VAC | Jordan | LVEA | N | Checking on HAM7 | 16:53 |
| 17:33 | ISC | Keita | LVEA | Y | HAM1 Lightpipe | 18:33 |
| 18:35 | EPO | Maggie + 30 | Overpass | N | Touring | 19:24 |
| 19:40 | EPO | Cassidy | Overpass +30 | N | Touring | 20:31 |
| 20:31 | PEM | Robert | EX | N | Grounding measurement | 21:44 |
| 21:07 | OPS | Ryan S | Optics Lab | Y | SPI Work | 23:17 |
| 21:23 | ISC | Rahul, Keita | LVEA | Y | HAM1, rahul out at 23:15UTC | 23:24 |
| 21:47 | ISC | Jennie | LVEA | Y | HAM1 | 23:47 |
| 23:36 | PEM | Robert | EX | N | Grounding measurement | 01:36 |