Reports until 17:26, Friday 20 February 2026
H1 IOO (ISC)
jennifer.wright@LIGO.ORG - posted 17:26, Friday 20 February 2026 (89218)
JAC work today summary

Jennie W, Keita K, Rahul K, Ryan S,

 

This morning Keita turned the power up to 1 W and the purge air down in order to scan the OMC and measure the modulation index.

We had some work to do to lock the JAC, the cavity wouldn't scan properly when managed by the guardian code.

Ryan and I have looked back at it and think there may be something wrong with the feedback to the PZT. It can't be the PZT itself though, because Keita and I were able to lock on the TRANS PD signal with the dither locking done manually by tuning the PZT offset to find the resonance and then turning on the feedback.

I have enclosed a picture to aid problem solving next week.


We then had problems keeping the IMC locked so Keita had to change the threshold used to check if the cavity is locked down to 2. This was changed at line 133 in ISC_library.py at userapps/h1/isc/guardian/.

trans_pd_lock_threshold = 2

We then managed to do three scans,

one with 45 MHz off, one with both on, and one with 9 MHz off. Detailed analysis in progress.


After turning the power back down Keita and Rahul swapped the mirror we currently have in front of the TRANS PD, with the uncoated laser window that is meant to be there (JACT_BS1).

They had to top gun and swab it to remove two dust particles first.

This replacement means the power to the PD is lower and so we needed to power up to 1W to check this alignment.

I have left the mirror we took out on the table on the -Y side labelled as 'HR mirror taken out of JACT-BS1'. Need to check which exact mirror this is with Masayuki on Monday.

Keita locked the cavity manually with the REFL PD and optimised the amount of light falling onto the TRANS PD.

I powered down to 100mW and de-energised the rotation stage and closed the light pipe at the end of the day. We also had the rotation stage de-energised and locked out when we were working in chamber.

Images attached to this report