Displaying report 1-1 of 1.
Reports until 17:20, Monday 16 March 2026
H1 General
ryan.crouch@LIGO.ORG - posted 17:20, Monday 16 March 2026 (89527)
OPS MOnday eve shift start

TITLE: 03/17 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Tony
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 17mph Gusts, 14mph 3min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.25 μm/s 
QUICK SUMMARY:

Displaying report 1-1 of 1.