The EDC was running with 59 disconnected channels from 3 IOCs:
PWRCS: old IOC has been retired, new IOC will roll out next week with new channel names, EDC will be restarted then.
DUST-LAB2: this monitor has been removed from the IOC, will remove from EDC at next restart.
HEPI-PUMP-CS: 3 channels were recently removed.
To remove these disconnects I am running a temporary containerized IOC on the service-host cluster called edc_green_ioc for the long weekend coming up. We should be able to retire or reduce this next week when we restart the DAQ and the production IOCs.