Reports until 22:30, Thursday 25 June 2026
LHO VE (VE)
gerardo.moreno@LIGO.ORG - posted 22:30, Thursday 25 June 2026 - last comment - 16:59, Monday 29 June 2026(90768)
CP1 Cooldown Update

(Jordan, Owen, Jake, Gerardo)

The cryotrap cooldown continues, we continue to pump on the cryotrap volume with a turbo pump, the turbo is backed with a SS500 aux cart.

Small changes were the removal of the calibrated leak from the RGA tree, along with the removal of other components in preparation to install an incoming small ion pump next week.

Current pressure in the cryotrap volume is 7.38X10-10 Torr.

 

Images attached to this report
Comments related to this report
jordan.vanosky@LIGO.ORG - 16:59, Monday 29 June 2026 (90814)VE

Jordan, Jake, Owen

The RGA tree was removed and replaced with the dedicated 75 l/s Starcell ion pump and a pumpdown port for the pump tree.

All flanges were helium leak tested, no He signal above the leak detector background were found. (~1.5E-10 Torr-l/s)

Volume is currently being pumped by a small aux cart, and the ion pump will be powered on tomorrow. The volume will then be introduced to the cryopump volume once the pump pressure reaches ~E-9 Torr on ion pump alone.

 

 

Images attached to this comment