Reports until 08:04, Wednesday 01 July 2026
H1 General
anthony.sanchez@LIGO.ORG - posted 08:04, Wednesday 01 July 2026 (90842)
Wednesday morning

TITLE: 07/01 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 13mph Gusts, 7mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.11 μm/s 
QUICK SUMMARY:

Potential work according to the trello schedule:
    BSC2 - Alignment check w/SQZ beam
    BS - Re-center OPLEV (Jason)
    TUES - BSC2 - ground loop checks and fixes (Fil, Oli, Betsy)
    BSC2 - L4C install at dome level (Mitchell, Jim)
    TUES - HAM3 - ground loop checks (Fil)
    BSC2 & 3 - B&K testing (TJ, Ibrahim, Rahul)
    HAM3/BSC2 - In chamber work, after FARO/HEPI work - Suspend, TFs (Ibrahim, Betsy, Oli)
    HAM7 - In-chamber SQZ work continued, local laser Haz

Potential CDS work not listed on the trello: 
    Longer than normal model restarts for PEM,  & CRS to include new channels , and new camera channels & maybe some HEPI beckhoff channels.