H1 General
anthony.sanchez@LIGO.ORG - posted 16:52, Thursday 02 July 2026 (90889)
Thursday Ops Report

TITLE: 07/02 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

LVEA is Now Laser Hazard! 

BSC2 Bolts are now on! 
VAC team is getting ready to close up BSC2. 
ITMS ISI's are balanced

ITMY Hardware watchdog trip immenant 19:09:00 UTC
ITMY Hardware watchdog trip 19:12:59 UTC

HEPI pump at EX  alarmed after Fil told me he was gonna Fiddle around with it at EX.
Vacuum at EX was taken down by Fil's EX HEPI work the same way as yesterday's EY HEPI, VAC Power glitch issue.

CRS team is still inside HAM3.
End X is now Laser Safe again and the TCS team is heading back to the corner.

 

LOG:                                                                         

Start Time System Name Location Lazer_Haz Task Time End
15:20 OPS TJ CR n Reservation test 15:48
15:30 JOT Camilla Prep LAB n Jack of all trades work 16:30
15:31 FAC Kim LVEA N Technical cleaning and resupply 17:58
15:51 PCAL Tony PCAL lab y checking on meas. 15:51
16:02 FAC Tyler PrepLab N Drilling Holes in the Jot Lab 16:47
16:23 CPS Jim LVEA HAM3 N CPS Install work 20:08
16:47 VAC Gerardo LVEA N Working on CP1 and other VAC stuff 19:47
16:54 VAC Jordan & Travis LVEA n taking down AUX carts from HAM1&2  Anualus 17:28
16:56 CHEETA Camilla PREP Lab N First contacting ZnSe 17:58
16:59 Safety Mc Carthy + 3 Roof N Firelook out and other Roof viewing. 17:31
17:02 CRS Shoshana LVEA HAM3 N Installing CRS 20:08
17:13 SEI Jim LVEA N BSC1 and 3 New balance! 20:13
17:17 PEM Robert, Shrey, Carlos End X N PEM work 18:58
17:47 IFO Betsy LVEA n Coordinating with crews on the LVEA floor & walk about 00:09
18:07 BCS TJ LVEA N balanceing the BSCs 20:31
18:55 TCS Camilla PREP Lab N First contact ZnSe 19:09
20:07 VAC Jordan & Gerardo LVEA HAM2 N Checking View ports. 21:07
20:15 VAC Travis LVEA N BSC2 dome Bolts! 22:41
20:15 CPS Mitchell LVEA HAM3 N Installing CPS 20:48
20:19 EE Fil EX N HEPI Beckhoff 22:19
20:29 PEM Robert LVEA HAM3 N Baffling work 00:39
20:35 PEM Ibriham LVEA N Cleaning up first contact 21:57
21:08 SUS Rahul Output arm N Measurements on ZM5 21:59
21:11 OMC Disha & Keita LVEA HAM6 N making measurements. 22:00
21:15 Cheeta Camilla Prep lab N First contacting 23:15
21:17 Safe tea Richard Gerardo LVEA N Checking on some safety Items. 21:27
21:22 SEI TJ & Jim LVEA BSC3 N Balancing ISI's and shaking SUS ITMX 23:22
21:28 CPS Mitchell LVEA HAM3 N Installing CPS 23:20
22:36 VAC Jordan & Gerado LVEA N Setting up annulus pump 22:41
22:37 TCS Camilia Madie EX yes Working on Hartmann 00:42
22:57 CRS Shoshana LVEA n quick in and out to push buttons 23:12
23:08 VAC Jordan LVEA N Parts hunt 23:14
23:36 CRS Shoshana LVEA Yes CRS work 00:36