TITLE: 08/17 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: After diagnosing some alignment troubles, work has continued towards being able to lock PRMI. The ITMY HWS SLED was swapped, the corner volumes continue to be pumped down, and the LVEA is still Laser HAZARD.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:38 | FAC | Randy | LVEA | - | ISI craning prep | 15:31 |
| 14:52 | FAC | Kim | LVEA | - | Technical cleaning | 15:47 |
| 16:35 | PSL | Jason | OptLab | - | Parts search | 16:56 |
| 17:04 | SEI | Jim | FCES | - | HAM8 ISI work | 21:04 |
| 17:07 | FAC | Kim | EY | - | Technical cleaning | 18:07 |
| 18:26 | VAC | Gerardo | LVEA | - | Checking HAM7 | 18:31 |
| 19:52 | FAC | Randy | LVEA | - | Craning scissor lift | 20:52 |
| 20:45 | VAC | Gerardo, Travis | LVEA | - | Prepping to move super sucker from HAM1 to HAM6 | 21:25 |
| 21:22 | SEI | Shoshana, Huyen | LVEA | - | Removing CRS laser copper block | 21:32 |
| 21:42 | DAS | Jenne, Reinhardt | LVEA | - | Running DAS fiber | 22:10 |
| 22:08 | SAF | TJ | LVEA | YES | Transitioning to Laser HAZARD | 22:40 |
| 22:42 | TCS | TJ, Camilla | LVEA | YES | Swapping ITMY HWS SLED | 23:29 |