TITLE: 09/30 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY:
GV20 work took place most of the day (and the thought is they may get it open today).
Other work: OMC scans, HAM2 SEI troubleshooting, CRS work, etc.
LOG:
- 1430-2125 crack sealing on x-arm road (randy)
- 1522-1800 OMC scans with SQZ beam after OM2 heating (camilla, sheila, ryanS)
- 1548-1607 technical cleaning @optics lab (kim)
- 1603 GV20 prep @EX (jordan, gerardo)
- 1613-1630 Dropping stuff into recycling outside HiBay (christina)
- 1637 GV20 (travis.betsy)
- Richard also made a trip out there back at 1924
- 1646 GV20 (tyler)
- 1738-1747 tcs chiller check (corey)
- 1750-1858 troubleshoot AI chassis channel for HAM2 SEI (jim.arnaud WP13669)
- 1828 HAM2 ISI tripped
- Overheard Jim tweaking CRS when he got back from CER.
- 1818 Apollo visitor (contacted bubba to connect with him)
- 1819-1848 PCal Lab (tony, caroline)
- 1832-1855 MY parts for storage (ryanC)
- 2042 Return to GV20 (travis,gerardo,jordan,betsy)
- Saw tyler making a trip to EX at the end of the shift.
- 2056 CRS work at TCS/CRS rack (jim,arnaud)
- 2120-2211 SGN group tour in control room and roof
- 2145 checking on GV20 status at EX (richard)
- 2158-2210 Checking on LVEA wind sensor (it's busted! Fil will replace it on a future cool morning.) [dave]
- 2203-2227 CHETA Lab work (camilla.sophie)