Displaying report 1-1 of 1.
Reports until 07:35, Friday 02 October 2026
LHO General
corey.gray@LIGO.ORG - posted 07:35, Friday 02 October 2026 (92157)
Fri Ops Day Transition

TITLE: 10/02 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 6mph Gusts, 3mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.11 μm/s 
QUICK SUMMARY:

Looks like work will continue around the CARM TO TR state for H1 locking. ISC LOCK currently in PREP FOR LOCKING; will run a manual alignment (y-arm flashing is about 1.3 & x-arm is about 0.4).

Displaying report 1-1 of 1.