Displaying report 1-1 of 1.
Reports until 16:30, Friday 02 October 2026
LHO General
corey.gray@LIGO.ORG - posted 16:30, Friday 02 October 2026 (92158)
Fri Ops DAY Summary

TITLE: 10/02 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC

STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY:

Today there was continued work looking at the lead-up to the CARM TO TR step for ISC LOCK.  For the most part DRMI reacquisition was fairly easy (Sheila alog-ed about a random PR3 move which was odd.) 

Toward the end of the shift, OM3's heater was increased from 1.0 to 4.0W for over the weekend.
LOG:

Displaying report 1-1 of 1.