Reports until 15:28, Wednesday 13 February 2013
LHO General
bubba.gateley@LIGO.ORG - posted 15:28, Wednesday 13 February 2013 (5486)
Apollo crew
We removed the septum between ham 3 and bsc 2, wraped in aluminum foil and ameristat, laid on a pallet. The bellows portion of the spool BE-3A was also removed and hard (aluminum) covers installed on both ends of said spool, and placed on a pallet. A aluminum cover was also installed on the rigid portion of BE-3A which is still connected to bsc 2. This spool will be removed tomorrow.
H1 IOO
keita.kawabe@LIGO.ORG - posted 15:02, Wednesday 13 February 2013 (5485)
IOT2L ready for move (Kiwamu, Keita)

I and Kiwamu disconnected all cable connectors from IOT2L, and cleared the area around the table in preparation for IOT move.

LEXAN covers were put in place on the viewports.

Laser curtains/dividers were put aside in front of the PSL room and are leaning on the west wall.

Things that seemed to be for I/O purpose (labeled containers for IO mirrors, some mirrors and a couple of mirror holders) were put in front of Cheryl's desk.

When moving the table:

1. Do NOT crane it as it would be hazardous, they're not designed for this.  Unlike iLIGO tables, the legs of these are merely held down by claws.

2. One heavy cable bundle is still attached to the table by a zip tie. Break it first.

3. Two ducts are still trapped between the chamber and the table, though the duct clamps are loose. We need to keep these ducts.

H1 SUS
mark.barton@LIGO.ORG - posted 12:58, Wednesday 13 February 2013 (5484)
PR2 AA chassis turned back on.
Arnaud P. and Mark B.

We noticed that the OSEMs on the M2 and M3 levels of PR2 were dead. Trending revealed that they had been dead since Tue 1/29. Richard investigated and found that the power to the AA chassis had not been turned back on after the power supply work that day (alog 5300). They're now back on and working.
H1 SUS
mark.barton@LIGO.ORG - posted 11:29, Wednesday 13 February 2013 - last comment - 14:16, Thursday 14 February 2013(5483)
PRM and PR3
Betsy and Deepak put the PRM and PR3 M2 and M3 OSEMs into the OL condition and I logged them. The values with corresponding gains and offsets are as follows:

>> prettyOSEMgains(logOLs('H1','PRM'),'PRM')
...
M2UL 24227 1.238 -12113
M2LL 25363 1.183 -12682
M2UR 25248 1.188 -12624
M2LR 26266 1.142 -13133
M3UL 24755 1.212 -12377
M3LL 24556 1.222 -12278
M3UR 26514 1.131 -13257
M3LR 25374 1.182 -12687

>> prettyOSEMgains(logOLs('H1','PR3'),'PR3')
...
M2UL 17618 1.703  -8809
M2LL 20217 1.484 -10109
M2UR 18644 1.609  -9322
M2LR 17674 1.697  -8837
M3UL 17262 1.738  -8631
M3LL 22811 1.315 -11406
M3UR 24286 1.235 -12143
M3LR 17108 1.754  -8554
Comments related to this report
betsy.weaver@LIGO.ORG - 14:16, Thursday 14 February 2013 (5496)

We had probably set these before since these numbers were very close to the ones found in the medm.  Nonetheless, we updated the medm fields with these numbers and then set the AOSEMs to 50% OLV.  Mark and Arnaud have been obtaining spectra for PR3 and PRM, one of the last measurements to conclude Phase 2b testing.

H1 SUS
arnaud.pele@LIGO.ORG - posted 08:31, Wednesday 13 February 2013 (5482)
MC2 PR2 Power Spectra
Attached power spectra of MC2 and PR2 from yesterday afternoon Feb 12th, comparing damping on and off. 

Non-image files attached to this report
H1 CDS
cyrus.reed@LIGO.ORG - posted 20:07, Tuesday 12 February 2013 (5480)
Network Firmware Updates
(Late Post)

Upgraded remaining 2 C2960 edge switches (sw-lvea-aux1, sw-mech-aux) to IOS 15.0.2SE2.  Upgraded C1142 wireless access points in LVEA and EY to IOS 12.4.25dJA2.  All work completed by 9AM today.
LHO General
patrick.thomas@LIGO.ORG - posted 19:24, Tuesday 12 February 2013 (5479)
plots of dust counts
Attached are plots of dust counts > .3 microns and > .5 microns in particles per cubic foot requested from 5 PM Feb. 11 to 5 PM Feb 12. Also attached are plots of the modes to show when they were running/acquiring data.

Data was taken from h1nds1.
9720 seconds worth of data was unavailable on this server
1440.0 minutes of trend displayed
'No data output' errors on some plots
Non-image files attached to this report
LHO General
patrick.thomas@LIGO.ORG - posted 18:51, Tuesday 12 February 2013 (5475)
Ops summary
HAM 2,3 volume was done venting this morning
Apollo removed the east door on HAM 3 and the blank on the septum
Filiberto and Vincent changed the connections of the ISI and HEPI cables to the BSC 1 expansion chassis to conform with the drawings for ADC and DAC usage
Richard to end Y to work on access control system
Filiberto moved satellite boxes for BSC1 to newly installed rack
Mark B. started running transfer functions on PR3
Fire department was on site testing alarms
Eric installed valves in the HEPI hydraulic lines
Jim working on BS in test stand in the afternoon
Rick went into the H1 PSL enclosure to investigate temperature fluctuations, turned out to be normal
CDS maintenance work
H1 CDS
david.barker@LIGO.ORG - posted 18:03, Tuesday 12 February 2013 (5478)
Maintenance Summary

SEI ITMY: Vincent and Richard. Changed the h1isiitmy and h1hpiitmy models to agree with Ben's drawings. Rearranged the ADC cables at the rear of the IO Chassis as part of this change. WP 3699 is closed.

added h1seib2 to the Dolphin and DAQ networks.

Installed new channel list in the h1broadcast0 dmt data. Restarted DAQ.

Cleaned up the EDCU CDS channels to remove obsolete front ends and add new front ends.

Jim connected h1oaf0, h1lsc0,h1asc0 RFM to the two RFM switches (X and Y arm), this removed the IPC errors on these front ends.

Imported h2susauxb478 as a first release of h1susauxb123 (removed FMX,Y components).

Powered up h1susauxh34 now that the IO Chassis power supply problem was resolved.

Added h1susbs, h1iopsusauxb123, h1susauxb123, h1iopsusauxh34 and h1susauxh34 to the DAQ.

New IOP models (drawing cleanup and adding SVN Id and HeadURL tags) installed into: h1iopseib1, h1iopseib2, h1iopsusauxh34, h1iopsusauxh2, h1iopsusauxb123.

WP3713 remains open as Hugo did not get to loading the new HAM ISI and HPI models. This may be done later this week.

H1 SUS
filiberto.clara@LIGO.ORG - posted 15:42, Tuesday 12 February 2013 (5476)
ITMY SUS H1-R6
SUS H1-R6 Field Rack was placed between BSC2 and BSC3 by Apollo. Moved SUS SAT Units for ITMY into final rack location. Units had to be powered down and disconnected for pulling and dressing cables into rack. All associated electronics have been reconnected and powered up.

Filiberto Clara
LHO General
bubba.gateley@LIGO.ORG - posted 15:05, Tuesday 12 February 2013 (5474)
Apollo crew
We removed the east door on ham 3 and then removed the blank on the septum. The door was then replaced on the ham with 4 bolts. All but 4 bolts on the BE-3A spool have been removed and those remaining 4 were backed off 1 turn in preperation for removal of septum and spool tomorrow. 
H1 SUS
mark.barton@LIGO.ORG - posted 15:00, Tuesday 12 February 2013 - last comment - 09:49, Friday 15 February 2013(5473)
PR3 TFs
Deepak and Bubba report they're done for the day, so commencing Matlab TFs on PR3.
Comments related to this report
mark.barton@LIGO.ORG - 07:14, Wednesday 13 February 2013 (5481)
Data taken, apparently successfully, plots pending.

Undamped: ^/trunk/HLTS/H1/PR3/SAGM1/Data/2013-02-12-1044746361_H1SUSPR3_M1_0p01to50Hz_tf.mat

Damped: ^/trunk/HLTS/H1/PR3/SAGM1/Data/2013-02-12-1044766428_H1SUSPR3_M1_0p01to50Hz_tf.mat
mark.barton@LIGO.ORG - 09:49, Friday 15 February 2013 (5509)
Plots finally - all good. This is a pass for Phase 2b TFs. Phase 2b spectra were waiting on some adjustments to the M3 OSEMs per alog 5499 (since fixed) and will be taken soon.
Non-image files attached to this comment
H1 SEI
james.batch@LIGO.ORG - posted 13:25, Tuesday 12 February 2013 (5472)
Added HEPI Pump Controller to Slow Controls Network
Cyrus Reed, Jim Batch

Run Cat. 5e cable for HEPI pump controller in Mechanical room mezzanine. Connect pump controller to network switch, reconfigure network settings in the pump controller to connect to the slow controls network.  Controller was NOT rebooted or restarted during this reconfigure.

Rename pump controller to h1hpipumpctrll0, modify user accounts to conform to CDS system.  Mount /opt/rtcds, /opt/rtapps, and /opt/cdscfg directories from h1boot to the pump controller.

X1 DTS
james.batch@LIGO.ORG - posted 12:50, Tuesday 12 February 2013 (5471)
Reconfigure x1dc0 to use additional mx 10GE card
For x1dc0, removed the 3 slot PCIe riser card, installed a 4 slot PCIe riser.  Installed 3 10GE fiber cards, 1 IRIG-B card.  2 of the 10GE cards are configured for mx communication to the x1daq switch to allow testing of daqd software on multiple paths.  The x1daq switch is configured for 1 vlan for both 10GE fibers and all the front end computers.  Through experimentation, the following order of cards has been determined:

(top to bottom)

10GE mx :0
10GE eth2
10GE mx :1
IRIG-B

Also restarted x1nds0, wouldn't allow ssh login.
H1 SUS
arnaud.pele@LIGO.ORG - posted 10:57, Tuesday 12 February 2013 - last comment - 16:45, Friday 18 October 2013(5468)
B&K Hammer Measurement
Arnaud P. Betsy W. 

Did B&K hammer measurements on Friday feb 8th on the BeamSplitter that will be installed in BSC2. 
Config: BSC-ISI Unlocked, QUAD Unlocked, Baffles ON, Vibration Absorbers ON, Damping ON.

Attached, pictures describing the position of hammer impacts, and accelerometer + corresponding pulse files.

Non-image files attached to this report
Comments related to this report
stuart.aston@LIGO.ORG - 14:26, Thursday 21 February 2013 (5551)
Raw data has been exported from the B&K Pulse files, in accordance with the procedure outlined in the SUS Operations Manual (see How to do B&K Hammer Testing).

Exported ASCII data files have been committed to the SUS svn at the following location, ligo/svncommon/SusSVN/sus/trunk/BSFM/H1/BS/BandK$, these files include the following (n.b. files have been renamed to comply with convention detailed in the Op's Manual) :-

SimpleHammerDisplay3-BS-Bottom-SUSunlocked-ISIunlocked-VAfitted-Yimpact.pls
SimpleHammerDisplay3-BS-Bottom-SUSunlocked-ISIunlocked-VAfitted-Yimpact.txt
SimpleHammerDisplay3-BS-BottomLeft-SUSunlocked-ISIunlocked-VAfitted-Ximpact.pls
SimpleHammerDisplay3-BS-BottomLeft-SUSunlocked-ISIunlocked-VAfitted-Ximpact.txt
SimpleHammerDisplay3-BS-BottomRight-SUSunlocked-ISIunlocked-VAfitted-Ximpact.pls
SimpleHammerDisplay3-BS-BottomRight-SUSunlocked-ISIunlocked-VAfitted-Ximpact.txt
SimpleHammerDisplay3-BS-TopLeft-SUSunlocked-ISIunlocked-VAfitted-Ximpact.pls
SimpleHammerDisplay3-BS-TopLeft-SUSunlocked-ISIunlocked-VAfitted-Ximpact.txt
SimpleHammerDisplay3-BS-TopLeft-SUSunlocked-ISIunlocked-VAfitted-Yimpact.pls
SimpleHammerDisplay3-BS-TopLeft-SUSunlocked-ISIunlocked-VAfitted-Yimpact.txt
SimpleHammerDisplay3-BS-TopMiddle-SUSunlocked-ISIunlocked-VAfitted-Ximpact.pls
SimpleHammerDisplay3-BS-TopMiddle-SUSunlocked-ISIunlocked-VAfitted-Ximpact.txt
SimpleHammerDisplay3-BS-TopMiddle-SUSunlocked-ISIunlocked-VAfitted-Yimpact.pls
SimpleHammerDisplay3-BS-TopMiddle-SUSunlocked-ISIunlocked-VAfitted-Yimpact.txt
SimpleHammerDisplay3-BS-TopRight-SUSunlocked-ISIunlocked-VAfitted-Ximpact.pls
SimpleHammerDisplay3-BS-TopRight-SUSunlocked-ISIunlocked-VAfitted-Ximpact.txt
SimpleHammerDisplay3-BS-TopRight-SUSunlocked-ISIunlocked-VAfitted-Yimpact.pls
SimpleHammerDisplay3-BS-TopRight-SUSunlocked-ISIunlocked-VAfitted-Yimpact.txt

The above B&K data has been processed using v12 of the "BandK_plot.m" Matlab script, available in the /ligo/svncommon/SusSVN/sus/trunk/Common/MatlabTools$ directory.

The merged plot attached below shows:-
pg1 - Y response of the structure to Y hammer impact excitations at various locations, from 1Hz to 400Hz.
pg2 - X response of the structure to X hammer impact excitations at various locations, from 1Hz to 400Hz.
pg3 - X response of the structure to X hammer impact excitations at various locations, ZOOMED IN from 50Hz to 400Hz.

n.b. hammer impact locations are viewable in the attachment to the original aLOG entry above see "Hammer_Impacts.pdf".   
Non-image files attached to this comment
arnaud.pele@LIGO.ORG - 18:27, Wednesday 25 September 2013 (7873)

For acceptance review, I reprocessed the data for the beamsplitter, after seeing a legend mismatch between the plotted results and the raw data from PULSE software.
Therefore the attached results below are the ones to look at, and are following the accelerometer axis convention represented on the last attachement

(1) BandK_results_X_Exc.pdf

(2) BandK_results_Y_Exc.pdf

(3) Picture of BS with axis convention and hammer impact location

The X and Y hits have been chosen to correspond to the "Top Middle" hits on the picture

Non-image files attached to this comment
arnaud.pele@LIGO.ORG - 16:45, Friday 18 October 2013 (8173)

Those results in X to X (blue of 1st pdf) and Y to Y (green of 2nd pdf) are not showing any high Q resonnances below 150Hz, meaning the vibration absorbers are working as expected, and the test passed succesfully.

LHO General
patrick.thomas@LIGO.ORG - posted 19:06, Monday 11 February 2013 (5467)
plots of dust counts
Attached are plots of dust counts > .3 microns and > .5 microns in particles per cubic foot requested from 5 PM Feb. 10 to 5 PM Feb 11. Also attached are plots of the modes to show when they were running/acquiring data.

Data was taken from h1nds0.
1440.0 minutes of trend displayed
Non-image files attached to this report
H1 DAQ
david.barker@LIGO.ORG - posted 17:22, Monday 11 February 2013 (5466)
h1fw1 back after Sunday Afternoon crash

Dan M investigated the MSR SATABOY failure which occured at 15:23 Sunday afternoon. The system was performing a weekly maintenance task and crashed, it is a mystery why this happed this weekend. He took opportunity of the stopped system to perform the same firmware upgrades on the Sun box h1ldasgw1 as he did with h1ldasgw0 last week. The h1fw0 system is back up and running.

We noticed a mismatch in min trend saving periods, 60 mins for h1fw1 and only 30 mins for h1fw0. I changed h1fw0 to use 60 mins which will be applied on the next daq restart.

H1 SUS
betsy.weaver@LIGO.ORG - posted 16:18, Monday 11 February 2013 - last comment - 10:10, Tuesday 12 February 2013(5461)
PR3 optic suspended

With the help of Gerardo 1 and 2, and Deepak, we used the ergo arm to stuff the PR3 optic into the suspension.  We then suspended the mass, adjusting roll and height to within the 1mm tolerance and 1mm.  Official height numbers coming shortly.  Deepak will tweek the top stage BOSEMs into center tomorrow and then we're ready for Phase 2b TFs.

Comments related to this report
betsy.weaver@LIGO.ORG - 10:10, Tuesday 12 February 2013 (5470)

We measured the diameter of the optic to be 265.1mm, while the vendor data posted on the CIT Nebula website shows 264.91 so we're in pretty good agreement.  We tweeked the height of the optic via adding 20g of mass to the top of the top mass, setting the bottom of the optic 26.6mm from the table surface.  This sets the center line of the optic at 158.75mm off of the table surface.  Nominal is 158mm as per the optomech layout drawing for PR3 on HAM2.

H1 SEI
hugo.paris@LIGO.ORG - posted 11:02, Friday 08 February 2013 - last comment - 17:30, Tuesday 12 February 2013(5427)
HAM-ISI - Viton Pads Efficiency Test

Viton pads are usually set under the balancing masses of the HAM-ISIs in order to damp resonances at high frequencies (above 100Hz).

The SEI team would like to asses the improvements that the Viton Pads help achieving. To do so, we decided to have viton pads under the balancing masses of the ISIs of LLO's IMC, and to try without those pads here at LHO.

Transfer functions were measured ovenight on LHO HAM3-ISI. We compared those transfer functions with the ones measured at LLO under an equivalent state:

Comparative plots are attached.

Non-image files attached to this report
Comments related to this report
hugo.paris@LIGO.ORG - 17:19, Monday 11 February 2013 (5464)

The script which produced the plots mentioned above was re-checked. The curves it displays match with the ouput of the generic commissioning scripts, for both LLO and LHO. 

Data in the 5Hz-200Hz range was retreived and added to the plot. Results are attached.

Non-image files attached to this comment
hugo.paris@LIGO.ORG - 17:30, Tuesday 12 February 2013 (5477)

The results presented above were calibrated and transposed into the cartesian Basis, as performed during the step 3 of the commissioning process of HAM-ISIs.

Narrow peaks can still be seen on LLO's transfer functions. We held off on the installation of the Scraper Baffles here, while they were already on the ISI at LLO, at the time of the measurement. It could be the cause of it.

Once HAM3 chamber is open, we will look at the items installed on the ISI. It should help clarifying the cause those peaks that we did not witness here.

I attached a picture of HAM3 chamber taken on Dec 6th 2012. Pumpdown started on Dec. 21st.

Non-image files attached to this comment