Reports until 11:24, Monday 24 December 2012
LHO VE
john.worden@LIGO.ORG - posted 11:24, Monday 24 December 2012 - last comment - 11:27, Monday 24 December 2012(5002)
HAM3-HAM2 Pumpdown

HAM3 pressures as of Dec 24,  11:00 am

Cold Cathode - 5.6 e-6

Pirani - 5.6 e-3

 

Not a typo - both gauges read 5.6 but 3 decades apart.

Comments related to this report
john.worden@LIGO.ORG - 11:27, Monday 24 December 2012 (5003)

Tumbleweed baling continues.

The buildings are relatively clear now. One lane has been opened to XMID, the crew expects this lane to be done to XEND at the end of today.

Wednesday they will start on the YARM - we need access for LN2 and work planned for the YEND station in early January. They expect to work

through the holidays except for Dec 25.

LHO VE
kyle.ryan@LIGO.ORG - posted 13:45, Sunday 23 December 2012 (5001)
Energized CC gauge -> Gauge has yet to fire -> foreline 6.6 x 10-3 torr
1345 hrs. local -> Leaving site now
LHO VE
kyle.ryan@LIGO.ORG - posted 13:12, Sunday 23 December 2012 (5000)
1315 hrs. local -> Arriving to connect gauge and check on pump down
Expect to be here 30 mins.
LHO VE
kyle.ryan@LIGO.ORG - posted 11:18, Saturday 22 December 2012 (4999)
Switched HAM2-HAM3 pumping over to Turbo
1030 hrs. local -> HAM2-HAM3 @ 1.2 x 10-1 torr -> Relatively fast rough-down (scroll pump) due to 2" hose connection to 2.5" Vent/Purge valve as opposed to pumping through deenergized turbo pump (observed ultimate pressure of this particular scroll pump is 3 x 10-3 torr).  

Tumbleweed crew bailing near Y-arm penetration.  

1115 hrs local -> Leaving site now.
LHO VE
kyle.ryan@LIGO.ORG - posted 10:18, Saturday 22 December 2012 (4998)
1015 hrs. local -> Arriving to check on pumps -> Expect to be here 30 mins


			
			
H1 CDS
david.barker@LIGO.ORG - posted 17:17, Friday 21 December 2012 (4997)
rebuilt the backup server

The CDS backup disk server cdsfs1 crashed late last night and would not reboot today. We could not recover its boot disk, so we reinstalled Ubuntu 10.04LTS. The backup raid contents were preserved, so no need to rsync everything from /ligo and h1boot again. We are now re-installing the backup scripts and linking the tape backup system.

cdsfs1 had become very flakey lately, hopefully the rebuild will fix this.

H1 SEI
james.batch@LIGO.ORG - posted 17:12, Friday 21 December 2012 (4996)
h1seih16 rebooted multiple times, ADC channel hopping
Models running on h1seih16 would not run more than a few minutes.  The IOP model would die with complaints of ADC channel hopping, the GDS TP screen showed ADC1 as the culprit.  In an effort to find the problem, Richard McCarthy 1.) reseated all the cards in the I/O chassis, then 2.) moved the ADC card for ADC1 to a different slot so it would no longer be ADC1, 3.) Completely rearranged the cards to match the h1seih23 system (minus 2 ADC cards).  In all cases, the models would stop after a period of time (up to 25 minutes) with the same complaint of ADC channel hopping and the indication that ADC1 was the problem.

David Barker modified the IOP model to only use 1 ADC card and the model was restarted.  So far after many hours, the IOP model is still running.  All cards were left in the I/O chassis for this test.

We need to troubleshoot this to find out if any 2 ADC cards cause channel hopping, or if there is a specific ADC card that is causing the issue, or some other cause.

LHO General
dale.ingram@LIGO.ORG - posted 16:22, Friday 21 December 2012 (4995)
Ops shift summary
A quiet day in the CR.  The biggest news was the startup of pumping of the volume between HAM's 2 and 3. See Kyle's entry below.  Kyle has his eye on the LN2 tank for CP4 which reads 31.3 today.  Tumbleweeds nixed last week's scheduled fill of this tank. Dave Barker, Jim and Richard swapped ADC cards for HAM1/HAM6 SEI in an attempt to provide readouts for seismic.  See Kiwamu's entry below regarding the move of IOT1.  The tumbleweed crew has been working all day.

Jeff Barlett, Mark Barton, Kyle and Dave Barker have placed work permits for work that will occur over the holiday break.
LHO VE
kyle.ryan@LIGO.ORG - posted 15:08, Friday 21 December 2012 (4994)
Began roughing HAM2-HAM3 @ 1345 hrs. local -> 400 torr @ 1455 hrs
Will be in occasionally to check on status, record pressure and to switch over to turbo etc. -> Will make aLOG stating my intended duration when I arrive and an entry when I leave site -> Am continuing to pump down Vertex + YBM over the break for the data.
H1 IOO
kiwamu.izumi@LIGO.ORG - posted 12:18, Friday 21 December 2012 - last comment - 14:41, Friday 21 December 2012(4992)
IOT1 moved in

The IOT1 table [1] was transported from the squeezer bay to the place next to  HAM2 where the table is supposed to be. The disk-shaped spacers were installed between the enclosure and legs after the table moved in there.

Some pictures will be uploaded shortely.

[1] LHO alog #4985

Comments related to this report
kiwamu.izumi@LIGO.ORG - 14:41, Friday 21 December 2012 (4993)
Images attached to this comment
H1 INS
bubba.gateley@LIGO.ORG - posted 17:54, Thursday 20 December 2012 (4991)
HAM doors and view ports installation
Ham 2 doors were installed and torqued and ham 1 west door was installed with 4 bolts.
Viewports were installed on all ports on ham 2 doors and protective covers as well.
First contact on the high quality view ports was removed by Gerardo and Douglas D.
H1 SUS
mark.barton@LIGO.ORG - posted 17:07, Thursday 20 December 2012 (4990)
BS damping
Mark B.

I installed damping filters on BSTST per advice of Stuart. The FM1 filters are as per ITMy and the FM2 are all "lp25": cheby1("LowPass",4,1,25). It damps happily with the gains Stuart had been using at LLO:

L = -2.00
T = -5.00
V = -4.00
R = -0.20
P = -0.04
Y = -0.05
H1 SUS
mark.barton@LIGO.ORG - posted 17:03, Thursday 20 December 2012 (4989)
SITEMAP and IOP DACKILL
Mark B.

I revisited the bug whereby the IOP DACKILL state is displayed white on some SUS screens. As Dave and I discovered the other day, it was due to an incorrect COMP argument being passed by SITEMAP.adl to SUS_CUST_QUAD_OVERVIEW.adl. It's supposed to give the text fragment to add to H1IOPSUS to give the IOP model name. For ITMy it should be COMP="B123", and I fixed that a few days ago. I recalled that there was also a lower case version comp, so today I confirmed that it was used and set it to "b123".

I also established that for QUADTST and BSTST, the strings should be "QUADTST" etc. Unfortunately attempting to enter them takes the total argument string over 256 characters, which is an error, so I left them wrong.
LHO VE
kyle.ryan@LIGO.ORG - posted 17:01, Thursday 20 December 2012 (4988)
Installed 8" gate valve + adapter spool + turbo pump on HAM3 bottom center East Door
Temporary pump connection for HAM2 + HAM3 isolated volume
H1 ISC
kiwamu.izumi@LIGO.ORG - posted 16:40, Thursday 20 December 2012 (4987)
ISC cables' missing list

This is just for a record.

The cables below are the ones that are currently not pulled or that need(ed) some modifications :

 CAB_H1:ISC_2        DB25MF (wrong gender [1], already fixed by a gender changer at each end)
 CAB_H1:ISC_16       DB25MF (a temporary cable will be installed)
 CAB_H1:ISC_24       DB25MF (in stock: to be installed)
 CAB_H1:ISC_25       DB25MF (in stock: to be installed)
 CAB_H1:ISC_26       DB9MF  (in stock: to be installed)
 CAB_H1:ISC_27             (too short [2])
 CAB_H1:ISC_28             (too short [2])
 CAB_H1:ISC_48             (too short [2])
 CAB_H1:ISC_206      DB25MF (in stock: to be installed)
 CAB_H1:ISC_208      DB25MF (missing)
 CAB_H1:ISC_209      DB25MF (missing)
 CAB_H1:ISC_211      DB9MF  (in stock: to be installed)
 CAB_H1:IOO_270      DB9MF  (wrong gender at C1. The other end will be checked)
 CAB_H1:ISC_310      DB37MF (missing)
 CAB_H1:ISC_311      DB37MF (missing)
 CAB_H1:ISC_321      DB25MF (missing)
 CAB_H1:ISC_322      DB25MF
(missing)

All of these cables are more or less related to the upcoming IMC locking and the other missing cables which are fairly independet of the IMC locking are not shown. Also this list doesn't count the cables associated with IOT2.

[1] LHO alog #4567

[2] LHO alog #4978

LHO General
corey.gray@LIGO.ORG - posted 16:04, Thursday 20 December 2012 (4981)
Day Shift Summary

There were a flurry of activities/measurements in the morning to get to a point where Kyle & Gerardo could start pumpdown on the MC section (HAM2, Input MC Tube, HAM3). 

Morning Meeting Notes:

  1. MC3 measurements continue
  2. Craning around BSC3
  3. Cheryl has optics she wants to check for 1st Contact
  4. CP2 Delivery today
  5. HAM3 Cabling for HEPI
  6. BSC3 HEPI Pier drilling

Day Acitvities

H1 SUS
mark.barton@LIGO.ORG - posted 14:54, Thursday 20 December 2012 (4986)
MC1/MC2/MC3/PR2 safe.snap
Mark B.

I updated the safe.snap files for MC1, MC2, and MC3 to lock in Cheryl's alignment work of the last week. For good measure I also updated PR2 because I wasn't sure of the provenance of the old file (of 11/26/12).

In each case I saved the old file with the modification date appended (e.g., h1susmc1_safe20121002.snap), and made a spare copy of the new file with today's date appended  (e.g., h1susmc1_safe20121220.snap).

Note that per current SUS policy, the suspension does _not_ come up with the offsets applied. The offset values are saved, but the offset enables are off, along with the damping enables, the test inputs and the master switch. Thus the laser needs to stay off until the offsets and master switch are reenabled.
H1 IOO
kiwamu.izumi@LIGO.ORG - posted 14:48, Thursday 20 December 2012 (4985)
IOT table ready for craining

The IOT table, which is currently in the squeezer bay, is ready to go.

 All the enclosure panels are now back in place and I have wiped the interior of the enclosure with iso since the table has been exposed for a long time (~ more than a week) because some of the panels had been off. In addition to it, I put some dog-clamps on the two periscope structures, which would otherwise potentially move during the crane business. Also I confirmed that the rest of the parts (i.e. mirror mounnts and etc.) on the table are sufficiently tightened so that they won't move.

 Note that the installation of the optics and electronics on the table is ongoing and will be completed after the craning.

H1 CDS
david.barker@LIGO.ORG - posted 12:55, Thursday 20 December 2012 (4984)
h1seih16 rebooted

In order to investigate the channel hopping error on the h1iopseih16 model, I powered down the h1seih16 front end and removed it from the Dolphin fabric (which allows us to reboot it without risk of crashing other front ends). I power cycled the IOChassis by removing the power cord and now the IOP model is running with no channel hopping error. We will keep h1seih16 running in this configuration to permit wiring tests for HAM1 HEPI this week.

Displaying reports 78261-78280 of 83128.Go to page Start 3910 3911 3912 3913 3914 3915 3916 3917 3918 End