Reports until 11:02, Friday 08 February 2013
H1 SEI
hugo.paris@LIGO.ORG - posted 11:02, Friday 08 February 2013 - last comment - 17:30, Tuesday 12 February 2013(5427)
HAM-ISI - Viton Pads Efficiency Test

Viton pads are usually set under the balancing masses of the HAM-ISIs in order to damp resonances at high frequencies (above 100Hz).

The SEI team would like to asses the improvements that the Viton Pads help achieving. To do so, we decided to have viton pads under the balancing masses of the ISIs of LLO's IMC, and to try without those pads here at LHO.

Transfer functions were measured ovenight on LHO HAM3-ISI. We compared those transfer functions with the ones measured at LLO under an equivalent state:

Comparative plots are attached.

Non-image files attached to this report
Comments related to this report
hugo.paris@LIGO.ORG - 17:19, Monday 11 February 2013 (5464)

The script which produced the plots mentioned above was re-checked. The curves it displays match with the ouput of the generic commissioning scripts, for both LLO and LHO. 

Data in the 5Hz-200Hz range was retreived and added to the plot. Results are attached.

Non-image files attached to this comment
hugo.paris@LIGO.ORG - 17:30, Tuesday 12 February 2013 (5477)

The results presented above were calibrated and transposed into the cartesian Basis, as performed during the step 3 of the commissioning process of HAM-ISIs.

Narrow peaks can still be seen on LLO's transfer functions. We held off on the installation of the Scraper Baffles here, while they were already on the ISI at LLO, at the time of the measurement. It could be the cause of it.

Once HAM3 chamber is open, we will look at the items installed on the ISI. It should help clarifying the cause those peaks that we did not witness here.

I attached a picture of HAM3 chamber taken on Dec 6th 2012. Pumpdown started on Dec. 21st.

Non-image files attached to this comment
H1 General
dale.ingram@LIGO.ORG - posted 07:55, Friday 08 February 2013 (5426)
Friday morning alarms in CR

I acknowledged the following alarms Friday morning:

All of these cleared when acknowledged except the IOP which remains yellow.

LHO General
bubba.gateley@LIGO.ORG - posted 06:54, Friday 08 February 2013 (5425)
Yesterdays report
The Apollo crew removed the ISI from BSC 10 and placed it on the north side of the termination slab, wraped, bagged and sealed. We chose to stand down on the ICC for now, instead we relocated the clean rooms that were over HAM 4 and BSC 1 and began disassembly of the E module and work platform around BSC 1 to be relocated to BSC 2.
H1 CDS
david.barker@LIGO.ORG - posted 17:56, Thursday 07 February 2013 (5424)
FMCS network at EX disrupted due to disconnected ethernet cable

At approx 08:10 this morning the network to the EX FMCS system and the wall camera was disrupted. Upon investigation we found that the ethernet cable in the VEA rack was disconnected. This cable had an extender and a 6 feet additional ethernet cable before it plugged into the Foundry switch. The connection at the extender was disconnected. We found that the extender was not needed any more and plugged the long haul cable directly into the switch.

H1 DAQ
david.barker@LIGO.ORG - posted 17:52, Thursday 07 February 2013 (5423)
h1fw0 down this afternoon

Dan from LDAS worked on the h1ldasgw0 system to investigate why h1fw0 has become unstable since last Wednesday 30 Jan with apparent disk write slow downs. He upgraded the firmware, we then restarted the h1fw0 writer. Jim has made h1nds1 the default nds because of this problem so the shutdown had minimal impact.

After h1fw0 was restarted we restarted the DAQ due to an 0x2000 status on h1hpiham1. It appears that the model change earlier made channel number changes and a change in DQ channels (perhaps a common model was changed recently).

H1 SUS
betsy.weaver@LIGO.ORG - posted 16:56, Thursday 07 February 2013 (5422)
PR3 optic - loaded into oven

The magnetized PR3 optic was loaded into the custom ABO today for a 6 hr. ~34 degC air bake.

H1 SUS
betsy.weaver@LIGO.ORG - posted 16:52, Thursday 07 February 2013 (5421)
PRM-04 optic suspended in suspension

Yesterday, we installed the PRM optic in the suspension.  Today, we adjusted roll and suspended it.  It has a bit of a pitch which we will need to work out tomorrow - the top mass is ~level and the optic is ~level, but the middle mass is pitched.  So, it's either the top mass blades, or middle mass weight configuration inducing pitch.  WIll confer with others and make adjustments tomorrow.  Preliminary height measurements do not indicate any major height problems.  Final numbers/tols will come later after tweeked.

H1 SEI
hugh.radkins@LIGO.ORG - posted 16:17, Thursday 07 February 2013 (5420)
WHAM1 HEPI Unlocked
I really didn't get to any L4C leveling but unlocking is the first step so I did get started on this long pending task.
Please be mindful of the signs and avoid the blue Crossbeams.
LHO General
gerardo.moreno@LIGO.ORG - posted 16:13, Thursday 07 February 2013 (5419)
Ops Shift Summary

Activities for today:
- Pole cavity measurement, PSL room, Michael R., Rodica M. and Paul F.
- Jim B., One-stop card addition, see his aLOG.
- Eric A., working around WBSC02, no cranning needed.
- Hugh, Cable relief at WHAM02.
- Ski, working fixing X-Mid intrument air.
- Kiwamu, ALS path work, PSL area.
- Praxair, LN2 delivery CP1.
- Kyle work at the input tube large ion pumps.
- Hugh, work at HAM01, HEPI is unlocked now.
- Dave and Jim, visited X-End troubleshooting FMCS/camera communication issues.

LHO FMCS
mark.lubinski@LIGO.ORG - posted 15:54, Thursday 07 February 2013 (5418)
FMCS data problem
The communication problem with X end FMCS has been fixed
LHO VE
kyle.ryan@LIGO.ORG - posted 15:51, Thursday 07 February 2013 (5417)
Replaced compressor #2 pressure relief valve on Y-end purge-air skid
Had found stuck open previously and had valved-out -> Now all (5) compressors are valved-in
LHO VE
kyle.ryan@LIGO.ORG - posted 15:35, Thursday 07 February 2013 (5415)
Moved South crane in LVEA from HAM2 to HAM3 then back to HAM2 ~1330 - ~1430 hrs. local
Used for fall protection whilst atop MC tube (Connecting HV cables to IP1 and IP2)
LHO FMCS
mark.lubinski@LIGO.ORG - posted 15:19, Thursday 07 February 2013 (5414)
X mid control air problem
Replaced bad solenoid on Drying tower, system is now back up and running
H1 SYS
hugh.radkins@LIGO.ORG - posted 14:32, Thursday 07 February 2013 (5413)
Cable Strain Relief Added WHAM2 Flange D3 (SUS AUX & Triples Etc)
See the attached photo showing how I've schemed Cable Stain Relief on this 12" 12 plug Feed Thru.
There are holes on the perimeter of the Shroud allowing an all thread to pass between cables.  The red cable conduit protects the cable from the threads.  All cabling should get strain relief and there are a lot of cables on D6(SW Corner) none of which have any relief yet.  There are still a lot of cables yet to be plugged into D3(PRMs.)  If anyone objects to this scheme or thinks installing these should wait until... please let me know.
Images attached to this report
H1 SUS
james.batch@LIGO.ORG - posted 13:54, Thursday 07 February 2013 (5412)
Added One-Stop Card to h1susauxb123 I/O Chassis
Added reworked one-stop card to I/O chassis for h1susauxb123.  Powered up chassis, then powered up h1susauxb123 computer to verify that all cards could be seen.  Note that no AA chassis are attached to this I/O chassis yet.
H1 SUS
james.batch@LIGO.ORG - posted 12:11, Thursday 07 February 2013 (5411)
Added One-Stop card to h1susauxh34 I/O Chassis, Power Supply is Dead.
Added a reworked one-stop card to the h1susauxh23 I/O Chassis, then powered up the chassis.  After about 15 seconds, the chassis died with what appears to be a bad power supply.  This was suspected before, but it hasn't been replaced yet.  
H1 SEI
james.batch@LIGO.ORG - posted 12:07, Thursday 07 February 2013 (5410)
Added Onne-Stop Card to h1seib2 I/O Chassis
Added a reworked one-stop card to the h1seib2 chassis, ran timing fiber from the ISC fanout to the I/O chassis.  Did not power up, as it appears there is a binary I/O card missing from the chassis.  
H1 SEI
hugo.paris@LIGO.ORG - posted 11:52, Thursday 07 February 2013 (5409)
HAM1-HEPI - IPS channels added to the model

The channels for the IPS (Inductive Position Sensors) were connected in the model of H1:HAM1-HEPI: h1hpiham1.mdl

Model was restarted at 11.02am. Readouts make sense. The new model is now commited to the SVN.

H1 ISC
kiwamu.izumi@LIGO.ORG - posted 11:19, Thursday 07 February 2013 (5407)
ALS PSL fiber setup : fiber power went down but then got back somehow ?

[Max and Kiwamu]

 Max noticed that the light coming out from the ALS-PSL fiber became at a micro watts level some hours after we tuned the fiber alignment [1] in the past Tuesday. Today we stepped in the PSL room again to investigate the causes and realign the optics. However it turned out that the coupled power was back at the same level of 1.7 mW as we had before. We don't have any idea of what happened as the slow channel for the fiber power monitor is not recorded yet. We need the channel to be recoreded to investigate this issue further. All we did today was addition of two more dog clamps for the base plate of the fiber coupler to make it stiffer and realignment of the steering mirrors.

Note :
 There is a BNC output, labeled as "external power", on the front panel of the fiber distribution box in ISC R4. This gave us a voltage of 0.12 V when the fiber output light was at 1.7 mW.

[1] LHO alog 5377 "Realignment of the ALS-PSL fiber launcher setup"

H1 PSL
michael.rodruck@LIGO.ORG - posted 14:34, Wednesday 06 February 2013 - last comment - 11:45, Thursday 07 February 2013(5390)
60 Hz noise gone

Turns out we left cables attached to the TFIN and TFA/B inputs on the PMC field box in the racks, with the MEDM switch enabling the TF path. Removing the cables got rid of the noise, and I disabled the path. There is still some 60 Hz noise but it is nothing like it was before.

This is something we've forgotten since the science run ended...always check the cables when noise hunting!!

Images attached to this report
Non-image files attached to this report
Comments related to this report
duncan.brown@LIGO.ORG - 09:28, Thursday 07 February 2013 (5403)
Checked the PSL PDA spectrum and ODC lock status again this morning and all looks fine. Thanks for following this up Michael.
Images attached to this comment
chris.pankow@LIGO.ORG - 11:45, Thursday 07 February 2013 (5408)
Excess power diagram of the past day or so. It's very clear that the high frequency noise diminishes and disappears in the recolored channel right around the time that the problem was corrected.
Images attached to this comment