Displaying reports 87941-87960 of 88272.Go to page Start 4394 4395 4396 4397 4398 4399 4400 4401 4402 End
Reports until 18:26, Thursday 18 November 2010
LHO FMCS
lisa.barsotti@LIGO.ORG - posted 18:26, Thursday 18 November 2010 (353)
Devices in the SQZ area
We borrowed these devices so far:

Power meter unit 5
ISCT1 viewer
Beam Profiler Photon XYS
SR785
Agilent 4396B
2 oscilloscopes

Since we are going to use them massively in the next weeks, we will keep them in the SQZ area.
If you need them, just let us know.
H2 INS
patrick.thomas@LIGO.ORG - posted 17:32, Thursday 18 November 2010 (345)
Dust monitoring BSC7
Mobile location #3 in the LVEA is monitoring the dust beneath the door of BSC7 as of ~9:23 this morning. It was moved from BSC8.

Attached is the full data trend from before the removal of the door to after the end of the LOS removal. The beginning may incorporate time from before the monitor was moved from BSC8.
Non-image files attached to this report
H2 General
jonathan.berliner@LIGO.ORG - posted 17:22, Thursday 18 November 2010 (352)
Ops Day Log
Key Points:
BSC7 - H2ITMX and H2FMX removed
Squeezer - On! Specific authorization + specific glasses required for entry to squeezer area

Times in PST:
1214 - Zach cuts himself by BSC7, MikeL brings first-aid kit, assess situation.
1320 - CarolB arrives for Betsy
1323 - DEA notifies LHO that Squeezer laser is on, and Squeezer area is in hazard condition.  Normal laser safety eyewear is not sufficient for protection in this area
1350 - Hanford emergency services calls with test message
1502 - Oscar is done bailing tumble-weeds for the day
1715 - OSB Doors Locked
H2 INS
cheryl.vorvick@LIGO.ORG - posted 17:00, Thursday 18 November 2010 (351)
BSC7 work - H2 ITMX and FMX removed:
- Jodi, Jim, Patrick, Zack, Rodney, Cheryl

BSC7 large optics removed - H2 ITMX and FMX.  The black glass beam dumps and supports were also removed. 

Tomorrow: remove weights and one steering mirror, and equipment for removing LOS (lazy susan, lift table).

Also:
Evaluated the plan for removing BSC4 (H2 Beam Splitter) structures, and decided that going through HAM9 or HAM10, depending on whichever is available first, would be the safest route to go.
LHO FMCS
dani.atkinson@LIGO.ORG - posted 16:37, Thursday 18 November 2010 (350)
Laser Hazard in East Bay Squeezer Setup
The lasers on the squeezer setup behind the barriers in the LVEA East Bay have been activated, and the area is now a laser hazard zone and will be properly marked when the lasers are on. Access is restricted to authorized personnel.

Note that the old LVEA glasses do not meet the requirements of this area.
LHO FMCS
john.worden@LIGO.ORG - posted 16:16, Thursday 18 November 2010 (348)
One night of wind
This is the Xarm after one windstorm. And the motorcycle parking is compromised. 
Photos by Richard.
Images attached to this report
LHO FMCS
kyle.ryan@LIGO.ORG - posted 16:09, Thursday 18 November 2010 (349)
Removed BSC7 east door
Others assited
X1 SUS
mark.barton@LIGO.ORG - posted 15:12, Thursday 18 November 2010 (347)
Second quad test stand filter update
I updated the filter bank on the quad test stand again to capture a few corrections that had been made to LLO's /opt/rtcds/tst/x2/chans/X2SUSQTS.txt since it was generated from LLO's /cvs/cds/llo/chans/L1QTS.txt in the recent upgrade. (A few filters had names that did not match their functions.) I took the LLO X2SUSQTS.txt file, changed all the instances of QTS_ back to Q1_ and installed it at LHO /cvs/cds/llo/chans/L1QTS.txt. The L1QTS.txt file that was in place for a day is at LHO /cvs/cds/llo/chans/L1QTS_LLO_20101117.txt. I also went through the MEDM screens and made sure that the correct filters were enabled (some filters are in different positions relative to the old LASTI set).
LHO FMCS
jonathan.berliner@LIGO.ORG - posted 14:48, Thursday 18 November 2010 (346)
Squeezer Phone Extension is 223
It is using the 4K OMC line.
LHO FMCS
kyle.ryan@LIGO.ORG - posted 18:06, Wednesday 17 November 2010 (344)
YBM, XBM, Diagonal
Began pumping YBM.  Dewpoint of "blowdown" air comming from YBM after decoupling purge plumbing measured -16C (John elected to not repeat exercise previously done with X-end ((see recent entries))but rather to just pumpdown)*Combined Diagonal with XBM by opening GV4*Vented combined volumes*Removed all but (4) loosened bolts from BSC7 east door.  Engine hoist connected to door and taking some of the load.
H2 General
cyrus.reed@LIGO.ORG - posted 16:12, Wednesday 17 November 2010 (343)
Ops Day Shift Summary
Main activities for today:
  • Prep for BSC7 vent.
  • Move H2 PSL table/clean aLIGO legs.
  • Decommission ISCT10.
  • Oscar bailing tumbleweeds on the arms.
Other activities (presumably) documented by work permit, or in the aLOG by the responsible parties.
X1 SUS
mark.barton@LIGO.ORG - posted 12:38, Wednesday 17 November 2010 (342)
Filter change on quad test stand
I updated the filters on the quad test stand ( /cvs/cds/llo/chans/L1QTS.txt ) with the set from the file of the same name and location at LLO. (Due to the recent upgrade at LLO, the working set there is actually /opt/rtcds/tst/x2/chans/X2SUSQTS.txt which is functionally identical but has been conformed to a new naming convention that has not yet been brought in at LHO.) The old filters are archived at cvs/cds/llo/chans/L1QTS_LHO_20101117.txt . The new filters correspond to the electronics at the sites, which is different from that at LASTI. Derek Bridges has summarized the filters as follows: 

Input filters (both chains, all OSEMs):
1. "10:0.4" - zero at 10 Hz, pole at 0.4 Hz - zpk([10],[0.4],1,"n")

Output filters (both chains, all OSEMs):
1. "1:31" - zero at 1 Hz, pole at 31 Hz - zpk([1],[31],1,"n")

DOF filters:
M0-X:
1. "0:15,15" - zpk([0],[15;15],1,"n") [the rest are similar with 15
replaced by 20 or 25]
2. "0.43Boost" - zpk([0.428;0.428],[0.1427+i*0.4035;0.1427-i*0.4035],1,"n")

M0-Y:
1. "0:15,15"

M0-Z:
1. "0:20,20"

M0-Yaw:
1. "0:20,20"

M0-Pitch:
1. "0:25,25"
2. "0.54Boost" -
zpk([0.324+i*0.432;0.324-i*0.432],[0.108+i*0.5291;0.108-i*0.5291],1,"n")
3. "1.13Boost" -
zpk([0.78+i*1.04;0.78-i*1.04],[0.26+i*1.2737;0.26-i*1.2737],1,"n")

M0-Roll:
1. "0:20,20"

R0-X:
1. "0:15,15"
2. "0.43Boost" - zpk([0.428;0.428],[0.1427+i*0.4035;0.1427-i*0.4035],1,"n")

R0-Y:
1. "0:20,20"

R0-Z:
1. "0:20,20"

R0-Yaw:
1. "0:20,20"

R0-Pitch:
1. "0:25,25"

R0-Roll:
1. "0:20,20"

Both chains, all DOFs:
10. "Ellip50"
LHO FMCS
richard.mccarthy@LIGO.ORG - posted 08:05, Wednesday 17 November 2010 (341)
H2 Electronics Room Concrete
It started early and fast.  Trucks arrived at 0700 and most of the heavy work done by 0745.  Slab for new H2 Electronics room done today.
Images attached to this report
X1 SEI
corey.gray@LIGO.ORG - posted 17:47, Tuesday 16 November 2010 (340)
HAM ISI Unit3 Disassembly Commences
(Corey, Jim)

Today, the unit#3 ISI was locked, and we began disassembly.  Weights were removed from the table top.  Masses were removed off the Outer Walls.  Some walls have been pulled off.  Some cabling has been coiled up.
LHO FMCS
kyle.ryan@LIGO.ORG - posted 16:59, Tuesday 16 November 2010 (339)
BSC8 door installed
Kyle-installed BSC8 south door
H2 General
dani.atkinson@LIGO.ORG - posted 16:11, Tuesday 16 November 2010 (338)
Ops Day Shift Summary
  • BSC8 got its door back, and work was made preparing BSC7 for deinstall.
  • Squeezers are closer than ever to turning on their lasers.
  • Richard and Co. tested kill circuits in preparation for the squeezers.
LHO FMCS
richard.mccarthy@LIGO.ORG - posted 13:50, Tuesday 16 November 2010 (337)
Laser Power Kill Ckt Tested
With the removal of all H2 electronics and cable trays, moved the kill button from the H2 PSL area to the Squeezer setup area.  Tested all five of the kill buttons to ensure they remove power from the five locations lasers can be plugged into.  They are TCS X,Y,  Diode Room,  4kPSL, Squeezer set up area.  Everything worked as designed.  Will have to repeat this process when I install a power outlet by Ham4 for the squeezer install.
LHO FMCS
cyrus.reed@LIGO.ORG - posted 11:11, Tuesday 16 November 2010 (336)
High Bay Card Access Restored
Card access to the LVEA via the High Bay/Large Equipment Access door should (in theory) be restored.  See Richard if you continue to have issues with that particular door.
H2 INS
david.barker@LIGO.ORG - posted 17:58, Monday 15 November 2010 (335)
summary of CDS work, week 8th - 12th
Rolf, Alex, Keith, Jim, Dave, Richard, Cyrus

The aligo CDS control room systems and the H2 front end
systems were installed during the week of 
Nov 9th - Nov 12th. Details can be viewed on the
network drawing D1002255 (last page)

Prior to this week I had installed a new rack in the
MSR to support the aligo CDS control room systems. This
rack has a network switch (for the OPS LAN, supports
control room and (L)VEA workstations), a NAT router
to the GC LAN, a new CDS wiki machine, a combined
NFS/DNS file server and an administration machine.
During this week we installed to routers between the
OPS LAN and the H2 FRONTEND LAN, these run the EPICS
gateway, the GDS gateway and the router.

We cloned the DTS boot server and created a new H2
boot server (called h2boot). We moved most of the
front end machines off the DTS system and put them
onto the H2 system. These machines are all located
in the Computer Users Room, next to the DTS.

We reracked the H2 DAQ system into its permanent rack,
but it is temporarily located in the CUR for testing, it
will permanently reside in the MSR.

We are running many H2 front end systems on these machines,
acquiring the data on the H2 DAQ.

We installed three new workstations on the OPS lan and
tested the major client code (dataviewer, dtt, medm)
across the networks.
H2 INS
patrick.thomas@LIGO.ORG - posted 16:14, Monday 15 November 2010 (334)
Ops Summary
Took over operator duties from Jonathan around 1:00.

Finished removal of all components from BSC8 (Cheryl, Jodi, Mitch, Jim, Patrick)
Richard, Cyrus diagnosing card reader access for the LVEA large equipment man door.
Gerardo to mid Y to move pallets into the lab area.
Assembly of squeezer experiment continues.
Displaying reports 87941-87960 of 88272.Go to page Start 4394 4395 4396 4397 4398 4399 4400 4401 4402 End