Ops Day Summary:
Tuesday Maintenance:

- Upgrades that took all of the front ends down for most of the day - Dave and Jim
- LN2 delivered to CP3, and it's back below alarm level at 98%
- the usual suspects for rugs, water, etc.

Things to recall:
- PSL laser is still down for RF wiring, expected back tomorrow
- tumbleweeds may be a problem for getting to EX

Alarms:
- h1oaf is white, it's off now, may or may not be white tomorrow, check with Dave
- ITMY and SEIB1 watchdogs are red
- PSL is red due to the laser beibg off
X1 SUS
stuart.aston@LIGO.ORG - posted 14:58, Tuesday 08 January 2013 - last comment - 15:51, Tuesday 08 January 2013(5046)
Triple Test-Stand Housekeeping
[Stuart A, Jeff B]

Jeff is ready to commence taking transfer functions on the triple test-stand and asked if all the recently updated automated Matlab testing scripts had been deployed. I therefore logged on remotely and svn'd up the following directories:-

/ligo3/svncommon/SusSVN/sus/trunk/Common
/ligo3/svncommon/SusSVN/sus/trunk/HSTS
/ligo3/svncommon/SusSVN/sus/trunk/HLTS

and just for good measure...

/ligo3/svncommon/SusSVN/sus/trunk/BSFM
/ligo3/svncommon/SusSVN/sus/trunk/QUAD

Earlier today I committed (rev 3913) of the Schroeder Phase Tools "Matlab_TFs.m" function, which fixed the argument validation for X1 and X2 triple test-stands, allowing HSTS and HLTS optics to be used. This was tested at LLO and has now also been tested and rolled-out on the LHO triple test-stand.

An example, for PR3 (HLTS), was added to the end of the "LHO_Matlab_TFs.m" script, demonstrating how to automate taking sequential M1-M1 undamped and undamped Matlab TFs on the LHO (X1) test-stand.
Comments related to this report
stuart.aston@LIGO.ORG - 15:51, Tuesday 08 January 2013 (5049)
I noticed that the EUL2OSEM and OSEM2EUL matrices were configured for a HSTS so I used the "make_sushlts_projections.m" script to generate the necessary elements and "fill_matrix_values.m" to populate the medm screen (as per LLO aLOG entry 2508).

I then observed damping loops would not close, so I switched the sign to the correct sign (+1 for a HLTS) on the SD BOSEM in the coil damping filters, and confirmed this enabled damping loops to close.

A burt snapshot has been taken of the current PR3 configuration, which has also been committed to the userapps svn.
H1 IOO
cheryl.vorvick@LIGO.ORG - posted 14:18, Tuesday 08 January 2013 - last comment - 11:59, Wednesday 27 November 2013(5047)
HAM2 witness plates: Installed Dec. 19, 2012
Attached are pictures of witness plates I installed in HAM2 before pumpdown.  There are 4" silicon wafers and 1" optics in the chamber, and most are on stage-0 of the ISI or in the beam tube, one 4" wafer is on the HAM2 table surface, near the North edge of the table.

#62 = NW corner of stage-0, showing three 1" optics and one 4" silicon wafer
#63 = beam tube North of HAM2 ISI, showing one 4" silicon wafer
#67 = W side of stage-0, showing one 4" silicon wafer
#70 = beam tube South of HAM2 ISI, showing one 4" silicon wafer
#71 = SW corner of stage-0, showing one 4" silicon wafer
#74 = HAM2 floor, under stage-0, showing two 4" silicon wafers

Not shown, one 4" wafer on the HAM2 table.


- Total number of 1" optics in chamber = 3.

- Total number of 4" wafers in chamber = 8.
Images attached to this report
Comments related to this report
cheryl.vorvick@LIGO.ORG - 15:45, Tuesday 08 January 2013 (5048)
Dec. 19th alog link:
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=5047
betsy.weaver@LIGO.ORG - 11:59, Wednesday 27 November 2013 (8763)

On Thur Nov 21st, 2013:  We (Calum and I) picked up 2 of the 3 1" optics just before closing up this time in order to reprocess the optic for future use.

H1 SUS
chris.mueller@LIGO.ORG - posted 18:05, Monday 07 January 2013 (5044)
MC2 M2 Coil Driver Modification
[Paul F. and Chris M.]

Today we modified the coil driver for the MC2 M2 stage per ECR E1200931 and described in Jeff Kissel's L1200226.  The serial number of the triple acquisition driver is S1100023.  This gives the middle stage of MC2 a factor of 10 boost in range at low frequencies which is needed for long term (> 5 mins) locking of the input mode cleaner.  

Attached is a picture showing the shorts added to channel 1 between resistors R11 & R27 and R10 &R21.  Also attached is a before and after transfer fucntion of each channel measured in the acquisition state.  
Images attached to this report
Non-image files attached to this report
H1 SEI
hugh.radkins@LIGO.ORG - posted 16:37, Monday 07 January 2013 (5043)
WHAM6 SEI Support Tube Install Underway
Scott Ed Zack & Slim

A little rusty, it has only been 14 years since we did this last but we got the South Tube into HAM6.  We did do the hard one first though, the North Tube should go much easier tomorrow.  Follow that with the Support Table, position work, and Bellows install.
A few photos for the archives.
Images attached to this report
H1 General
justin.bergman@LIGO.ORG - posted 16:03, Monday 07 January 2013 (5042)
Ops Shift Summary
•	0845 Hanford Fire onsite all day doing maintenance and testing of outbuilding fire alarms with Rodney.
•	0900-1300 Terry, Christina, Chris and Karen cleaning various areas in LVEA---BSC1, BSC2, test stands. Corresponding dust alarms periodically.
•	0930 Corey installing LED lamps on LVEA ISC table.
•	1000 Rental tractor delivered to Mid-Y for tumbleweed crew (Valley Tractor).
•	1045 Jim B examining test stands in LVEA.
•	1119 Dave B restarting H1SUSIM.
•	1445 HFD work complete.
•	1530 Apollo breaking bolts on BSC1 in anticipation of removing south door tomorrow.
H1 SUS
mark.barton@LIGO.ORG - posted 11:52, Monday 07 January 2013 - last comment - 09:57, Tuesday 08 January 2013(5041)
MC1 and MC3 TFs
Mark B.

I checked out the basic functionality of MC1 and MC3 and they seem fine after the rerouting of their cables. Matlab TFs will start shortly. The corresponding MEASUREMENT STATUS indicator will flash when a TF is underway on a particular suspension. The damped TFs will be done first in case in case the whole run is not done by the time of the RTCDS v2.6 installation tomorrow and needs to be interrupted.
Comments related to this report
mark.barton@LIGO.ORG - 09:57, Tuesday 08 January 2013 (5045)
Mark B.

All four runs finished by 09:30, analysis pending. CDS OK to take system down for v2.6 upgrade.

MC1 undamped: /ligo/svncommon/SusSVN/sus/trunk/HSTS/H1/MC1/SAGM1/Data/2013-01-07-1041624077_H1SUSMC1_M1_0p01to50Hz_tf.mat
MC3 undamped: /ligo/svncommon/SusSVN/sus/trunk/HSTS/H1/MC3/SAGM1/Data/2013-01-07-1041643408_H1SUSMC3_M1_0p01to50Hz_tf.mat
MC1 damped: /ligo/svncommon/SusSVN/sus/trunk/HSTS/H1/MC1/SAGM1/Data/2013-01-07-1041662788_H1SUSMC1_M1_0p01to50Hz_tf.mat
MC3 damped: /ligo/svncommon/SusSVN/sus/trunk/HSTS/H1/MC3/SAGM1/Data/2013-01-08-1041682194_H1SUSMC3_M1_0p01to50Hz_tf.mat
H1 FMP
jodi.fauver@LIGO.ORG - posted 10:11, Monday 07 January 2013 (5040)
X Arm and X End status
The tumbleweed situation on X Arm remains dicey. One lane was cleared from the corner to the end however there has been some encroachment due to subsequent weather. The road section from the corner to the mid is a little intimidating because of the height of the tumbleweed piles but is passable as long as you don't hurry too fast. The road section from the mid to the end is somewhat more open. 

ICC is complete, the new spool pieces are installed and married up and all doors are returned to the chamber.
H1 FMP
jodi.fauver@LIGO.ORG - posted 10:05, Monday 07 January 2013 (5039)
Y Arm and Y End status
The tumble weed situation down Y arm has not changed since last week: wide open from corner to mid, one lane open from mid to end. Please be careful of machinery by second beam tube enclosure door from mid.

The vinyl flooring by the front of BSC10 and under the test stand location is completely installed. The leg of the E-module is sitting back down on the floor so the crane is available for use.
LHO VE
kyle.ryan@LIGO.ORG - posted 09:24, Monday 07 January 2013 (5038)
HAM2-HAM3 pumpdown
0900 hrs. local 

1.7 x 10-6 torr @ turbo inlet 
H1 SEI
greg.grabeel@LIGO.ORG - posted 17:24, Friday 04 January 2013 (5035)
BSC 3 HEPI Status
BSC 3 now has its HEPI housing installed and locked in place. The blue-iron brackets are still in place for now but will be moved to BSC 8 for swapping back in the iLIGO stacks.

The hydraulic actuators on BSC 8 will also be moved over to BSC 3. One bolt had galled on BSC 8 horizontal actuator but was cut out. After removal the HEPI foot will need to be fixed.
Images attached to this report
H1 SEI
hugh.radkins@LIGO.ORG - posted 16:17, Friday 04 January 2013 (5034)
WHAM3 HEPI Horz L4-C Replaced--***System Now Locked***
This morning I relocked the HEPI elements after yesterday's L4-C replacement.

As I said yesterday, there was motion when I unlocked but after putting the motion into Global Coordinates, the motion suggest these were just strains put into the system when it was locked.  There has been a lot of activity at the HAMs between Dial Indicator removal and IPS coming on line.  So, I look forward to hearing from IO that the Mode Cleaner is still flashing.
The Global Coordinate shift is 15urad and the average translations are less than 0.1mm after everything is replaced and relocked.  The shift from floating to locked is much less than these numbers.
I did not zero out these readings as I did on HAM2 alog5018.  The Pier3 Horizontal Actuator may need adjustment; I'll wait to zero HAM3 until that is complete.
H1 SUS
mark.barton@LIGO.ORG - posted 14:50, Friday 04 January 2013 - last comment - 08:48, Saturday 05 January 2013(5033)
BS Tfs
Mark B.

Preparing for undamped and damped Matlab TFs on the BS. "Measurement Status" indicator on the MEDM screen should go on automatically when underway and off when done.
Comments related to this report
mark.barton@LIGO.ORG - 08:48, Saturday 05 January 2013 (5036)
Mark B.

The measurement attempt finished on schedule but was a disaster from the point of view of results: the script consistently failed to read data from NDS, even after 25 attempts for each drive segment. This is reminiscent of an old bug that Stuart worked to fix and indeed the same script worked for MC2 the other night. Debugging continues.
H1 DAQ
james.batch@LIGO.ORG - posted 09:02, Friday 04 January 2013 (5032)
Restarted h1broadcast0's daqd process
Restarted the daqd process on h1broadcast0.  Prior to doing this, David Barker revised it's broadcaster.ini file to specify the list of channels requested by John Zweizig, and modified the daqdrc file to cause the daqd process to read the broadcaster.ini file.

The date on the h1broadcast0 machine is Jan. 1, although the time of day is correct.  This will be corrected.
H1 SUS
mark.barton@LIGO.ORG - posted 12:44, Thursday 03 January 2013 - last comment - 10:00, Friday 04 January 2013(5023)
MC2 TFs
Mark B.

Taking TFs on MC2 from 12:45 pm.
Comments related to this report
mark.barton@LIGO.ORG - 10:00, Friday 04 January 2013 (5030)
Mark B.

Undamped and damped TFs completed overnight.

Undamped: /ligo/svncommon/SusSVN/sus/trunk/HSTS/H1/MC2/SAGM1/Data/2013-01-03-1041282012_H1SUSMC2_M1_0p01to50Hz_tf.mat
Damped:   /ligo/svncommon/SusSVN/sus/trunk/HSTS/H1/MC2/SAGM1/Data/2013-01-03-1041300220_H1SUSMC2_M1_0p01to50Hz_tf.mat

In the undamped data there's a dropout in the L data below 0.5 Hz, but everything else is good and the suspension looks in good shape.

All the damped data is good, but the suspension looks horribly overdamped in Y and P, and the gains need to be checked.
Non-image files attached to this comment
H1 IOO
cheryl.vorvick@LIGO.ORG - posted 17:47, Wednesday 02 January 2013 - last comment - 08:56, Monday 07 January 2013(5020)
IM3 on a EQ stop: all IMs undamped
I ran a quick test today on IM3, which now has the largest offsets of the 4 HAM AUXs.  In the attached plot, red shows the pitch offset, black the yaw offset - blue shows very different behavior when each offset it removed - the damping of the oscillation when the pitch offset is removed shows the optic is touching an EQ stop.

I left all HAM AUXs, IM1, IM2, IM3, and IM4, undamped overnight.
Images attached to this report
Comments related to this report
giacomo.ciani@LIGO.ORG - 08:56, Monday 07 January 2013 (5037)

Please keep in mind that the Eddy Current Dampers coupling with pitch is _much_ stronger than that with yaw, so I would't considere the different decay rates as evidence of rubbing.

If rubbing is indeed suspected, I would suggest to check by either running a full set of TF and looking for anomalies, or trying a (small) DC actuation of pitch and yaw in both direction and looking for asymmetries in the displacement measured by the OSEMs.