H2 INS
keita.kawabe@LIGO.ORG - posted 17:58, Monday 25 October 2010 (245)
ISC deinstall starts
Started pulling optics etc. from ISC 7.

General purpose mounts, beam dumps etc. are restocked in the optics lab cabinets. 

Most of labeled optics are put in boxes and stored in ISC cabinets, some are returned to the optics lab.

The work will continue several days more.
LHO FMCS
kyle.ryan@LIGO.ORG - posted 17:46, Monday 25 October 2010 (244)
Vertex vent activities and Y-mid gate valves
Closed GV10 and GV11 (Ski et al. craning scissor lift over VE).  Note GV11 "clanked" atypically when gate cammed closed.  



Started CS purge air compressor*Closed GV1 and GV2*Started Vertex, XBM and YBM QDP80s and Main turbo pumps*Vented Vertex and HAM6 volumes simultaneously (note: new requirement to maintain <0.5 atm pressure difference across HAM6 septum as the result of design flaw awarness-see Mike Z., Dennis C., John W., Albert L.)*Isolated BSC1 annulus ion pump*removed all but (4) door bolts from BSC1 South door
H2 DAQ
gregory.mendell@LIGO.ORG - posted 17:39, Monday 25 October 2010 (243)
DCS (LDAS) transition to A6 (After S6) archiving of DAQ (CDS) data
DCS (LDAS) transitioned to A6 (meaning "After S6") on Oct. 20, 2010, shortly after 8 am local time. During this time period all raw (L0) data at LHO and LLO is being copied to the site LDAS archives, and also is being transferred to the CIT LDAS archive, whenever this data is available from any of the DAQ (CDS) framewriters. The same holds for second-trend and minute-trend data. We continue to rsync any new DMT data, whenever it is available, but no LDAS RDS data is being generated during this time period.

Note that the raw (L0) data will soon be pared down to mostly PEM data, and there will be no interferometer data until squeezing data and aLIGO test data begins to be written to the raw frames. 

Thus, if you are looking for data "After S6" outside of the control room, ask about A6 data.
X1 SUS
jeffrey.bartlett@LIGO.ORG - posted 16:28, Monday 25 October 2010 (241)
Top Mass Magnets and Sgns
Reset all Top Mass flag magnets on Quad-2 to conform to Derek’s document E1000617. Set the Gains in MEDM to conform to Mark’s document E1000494. Ran Actuator Sign Test and all responses were positive. 

Main Chain 
FACE1	N	-1
FACE2	S	 1
FACE3	N	-1
LEFT	S	 1
RIGHT	N	-1
SIDE	N	-1

Reaction Chain      
FACE1	N	 ?  No apparent actuation
FACE2	N	-1
FACE3	S	 1
LEFT	N	-1
RIGHT	S	 1
SIDE	N	-1
H2 INS
gerardo.moreno@LIGO.ORG - posted 14:33, Monday 25 October 2010 (240)
H2-ETMY Transmission Monitor Removed
Removed transmission monitor and components, including green pier.
Components are stored inside the VEA, they will be removed in the near future.

Output viewport is covered with a safety viewport cover.

Cables were removed last week, see here.
X1 SUS
betsy.weaver@LIGO.ORG - posted 09:44, Monday 25 October 2010 (239)
Q2 Magnet polarities and servo controls
M0:
FACE1   S
FACE2   N
FACE3   S
LEFT    N
RIGHT   S
SIDE    N

R0:
FACE1   S
FACE2   S
FACE3   N
LEFT    S
RIGHT   N
SIDE    N

Which gives the following signs on the OUTPUT gains.

M0:
FACE1   1
FACE2  -1
FACE3   1
LEFT   -1
RIGHT   1
SIDE   -1

R0:
FACE1   ? Having problems
FACE2   1
FACE3  -1
LEFT    1
RIGHT  -1
SIDE   -1

The polarities appear to be 180 deg out of phase from Derek's poster cheat sheet E1000617.
Jeff is going to go switch all magnets and then reset the servo gain signs.  Hopefully this will then match the poster.
LHO FMCS
kyle.ryan@LIGO.ORG - posted 16:52, Friday 22 October 2010 (238)
Y-end instrument air alarm
Had transient low value for the instrument air pressure at the Y-end station this morning.  No recent history or trend -> probably due to users activity.
H2 General
patrick.thomas@LIGO.ORG - posted 16:24, Friday 22 October 2010 (237)
Ops Day Summary
The instrument air pressure briefly alarmed, Kyle has been notified:
22-Oct-2010 10:17:34 : HVE-EY:INSTAIR_PT499         LOW          MAJOR            59

Apollo finished cleaning in the LVEA

The crane inspections in the LVEA are completed

The crane training class was held this morning

Cheryl and Aidan continued TCS decommissioning
Cheryl turned the clean rooms on in the LVEA

Corey and Eric continued drilling holes at HAM 12

Gerardo, Cyrus and Jodi worked on the clean rooms at mid Y

Reboldt came to work at end Y

The Genie lift was moved to end Y, Apollo will probably begin cleaning there next week
H2 INS
gerardo.moreno@LIGO.ORG - posted 15:57, Friday 22 October 2010 (236)
Optical Lever Power Supplies
Finished removal of optical lever power supplies, removed the power supply for ETMX and ETMY.
Power supplies are stored on the racks of receiving/storage area of the LSB.
H2 General
corey.gray@LIGO.ORG - posted 13:16, Friday 22 October 2010 (233)
HAM12 HAM Pier Anchor Holes Drilled
(Eric A., Corey G.)
All the holes have been drilled (15 today.  It took one $200 Hilti drill bit to get through about 14 holes--that steel rebar is a pain!).

Eric will clean out the holes, check their depths, and cover them with tape.  The vinyl-ish flooring has been removed.  The final thing we would like to do is rough the concrete for the grouting--will try to do this Monday, time permitting.
X1 SUS
jeffrey.bartlett@LIGO.ORG - posted 12:29, Friday 22 October 2010 - last comment - 14:05, Friday 22 October 2010(232)
Glitch on MO Rt Channel

  Still have a glitch in the Main Chain right channel in satellite box 3200715. We have eliminated cables and OSEM as the problem source. Swapped SB 3200715 and SB 320078 and problem stayed on MO Rt. Moved cables back to original position.
 
  We swapped cables on the AA channel and the AI channel. Glitch moved from MO Rt to MO F1; possible problem in the AA or AI chassis. Filiberto is going to do some more testing this afternoon to determine which chassis is at fault.      
Comments related to this report
filiberto.clara@LIGO.ORG - 14:05, Friday 22 October 2010 (234)
Found bad 25 pin D-sub cable (CAB_TSI_SUS_13). Replaced with new cable and MO Right signal does not show the reported glitching from earlier. 
H2 General
cheryl.vorvick@LIGO.ORG - posted 11:30, Friday 22 October 2010 - last comment - 15:43, Friday 22 October 2010(231)
Clean Rooms Started
I've started 3 clean rooms in the LVEA to counteract the dust from cleaning, and get the area ready for vents next week.  HAM3, HAM8, and HAM6 clean rooms are ON.  The clean room over HAM1 needs to have the large switch at the top of the clean room moved to the ON position, before it can be started.  
Comments related to this report
cheryl.vorvick@LIGO.ORG - 15:43, Friday 22 October 2010 (235)
Clean room over HAM1 is now ON.
H2 INS
david.barker@LIGO.ORG - posted 10:23, Friday 22 October 2010 (230)
robofom and roboscimon turned off
Turned off the robofom and roboscimon cron jobs on script1 and control100.
H2 General
james.batch@LIGO.ORG - posted 17:46, Thursday 21 October 2010 - last comment - 17:59, Thursday 21 October 2010(228)
Modify suspension test stand to allow workstation access to burt files
Fix problem with suspension test stand workstation (suswork1) where it is unable to access files for burt restore.  Found that burt's .snap files are stored in bscteststand:/data/autoburt/ which was not accessible on suswork1.  Did the following:

Modify bscteststand computer to export /data for nfs mounting on suswork1

Modify suswork1 to mount bscteststand:/data on /data

Verify that burtgooey on suswork1 can access .snap files on /data
Comments related to this report
james.batch@LIGO.ORG - 17:59, Thursday 21 October 2010 (229)
Same access problem on seismic test stand, modified seiteststand and workstation the same way.
H2 General
filiberto.clara@LIGO.ORG - posted 17:25, Thursday 21 October 2010 (227)
Removed H2 Electronics from Mid Y
Removed H2 electronics from Mid Y (Rack 1x18 and 1x19). List of items removed:
1	ASC Quad Photodiode Whitening Board D990399 SN10
2	Anti-Image D000186 Rev D SN155
3	Universal Dewhitening Board D000183 SN 113 REV B
4	Universal Dewhitening Board D000183 SN 164 REV C
5	Opt Lever PD Interdace D010033 Rev B SN143
6	Anti-ImageFilter Board D000186 REV C SN125
7	Universal Dewhitening Board D000183 SN 02 REV A
8	Tidal and Mircoseismic Summing Module D020094 SN107
9	SUS PD White/Interface Board D000210 Rev A SN31
10	LOS Bias Module D000341 SN109
11	VMIVME 7851 -  h2iscmy
12	Pentek Model 6102
13	Pentek Model 6102
14	D980369 SN120
15	ICS-110B-32 (no dhrtr)
16	SYNC TIMING GEN. D050093 SN LHO19
17	DOUT XVME220
18	VM8DAC-8 (Frequency Devices Inc.)
19	Variable Time Delay Module D010285 REV A SN 129
20	 h2iscauxmy  (MVME 162-262)
21	VMIVME 3113A
22	DOUT XVME-220
23	VMIVME 4116
24	VMIVME 4116
25	D990147 SN001
26	Satellite Amp Adapter D010069
27	LOS Coil Driver D000325 SN113
28	h2gpsmy MVE 162-333
29	Brandywine VME Card
30	UPS Fortress 1425
31	Isotron - Power Supply Model 2793



H2 General
aidan.brooks@LIGO.ORG - posted 17:11, Thursday 21 October 2010 (226)
H2 TCS removal
Cheryl and I have removed everything (optics, lasers, AOMS, etc) from H2:TCSX. On TCSY we've removed everything with the exception of the AOM and laser which need to be disconnected from the plumbing. 

We were going to drain all the plumbing of the ethylene glycol but it turned out that this had been at some point in the distant past.

We have an inventory of all the parts that have been pulled.
H2 General
patrick.thomas@LIGO.ORG - posted 16:34, Thursday 21 October 2010 (225)
Ops Day Summary
Corey Gray, Eric Allwine, Hugh Radkins worked on marking and drilling holes for the HAM 12 Pier Anchor Bolts

Gerardo Moreno started removing the H2 optical lever power supplies from the LVEA

Paul from Control Solutions NW came to fix the FMCS system in the control room

Patrick Thomas, David Barker removed the control2 sun computer and replaced it with the control10 linux computer, also removed the windows control room Spiricon PC

Richard McCarthy, Filiberto Clara removed the H2 electronics in mid Y

Cheryl Vorvick, Aidan Brooks worked on decommissioning H2 TCS

GV5 and GV7 were soft closed, the Genie-lift was craned over the beam tube, cleaning and crane lift tests continued in the LVEA

Cyrus Reed went to look at the phone system in mid Y

Reboldt Mallon worked on repairs, concrete grading, roof at mid Y